My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services <br />SYRUSA has selected personnel and organized our <br />team to best manage the Project services. We've <br />identified staff that can support Project goals related <br />to schedule, budget, quality, and partnership. Our <br />key and additional personnel ensure that at every <br />level our team has the ability to plan and deliver this <br />Project successfully for the City. <br />SYRUSA's team will report directly to the City's <br />Construction Manager. The key personnel for the <br />Project, Project Manager/Principal Agent Jerry De <br />Santos, Construction Manager/Resident Engineer <br />Jose Corona, Structure Representative Luis <br />Negrete, and Communications/Public Outreach <br />Manager Andrea Suarez, have the expertise and <br />experience to assist the City in the successful <br />completion of the Fairview Street bridge over the <br />Santa Ana River. <br />The SYRUSA Team includes services that are <br />available, as needed, to serve as an extension <br />of City staff. Having all these resources available <br />enables the smooth and timely completion of the <br />project, ensuring that the project is completed <br />in accordance with the contract documents and <br />meets the expectations of the project stakeholders. <br />Exhibit D.3: Tasks and Deliverables in Section <br />D. Understanding the Need details the Scope <br />of Services, which includes the work phases to <br />be completed, the tasks to be accomplished, the <br />deliverables to be provided, potential risk, and the <br />risk mitigation strategy to complete for the Project. <br />Below is a summary of the tasks and our strategies <br />for each task, based on the Scope of Work detailed <br />in Attachment 1 of the RFP. <br />PHASE 1: PRE -CONSTRUCTION SERVICES <br />1.Task/Deliverable: <br />Constructability Review <br />Provide a thorough review of the previously <br />completed constructability review and provide <br />any comments and/or recommendations to <br />ensure all comments are met and up to date. <br />Review contract documents and clarify before <br />going out to bid for construction. <br />2.Task/Deliverable: Schedule and <br />Sequencing <br />• Provide a thorough review of the construction <br />sequence necessary to complete the <br />improvements included in the construction <br />contract. <br />• Independent schedule compared to planned <br />schedule to identify and discrepancies. <br />3.Task/Deliverable: Utilities <br />• Review potential utility conflicts and identify <br />items requiring coordination with third party <br />utility agencies. <br />• Review utility agreements to confirm scope <br />and timing. <br />• Verify utility locations. <br />• Create a materials list for temporary water line. <br />• Review soil parameters in anticipation of <br />shoring. <br />4.Task/Deliverable: Bid Items and <br />Contractual Documents <br />Review measurement and payment sections <br />of the Specifications to ensure that the <br />proposed work specified is covered by a bid <br />item and identify any missing and/or redundant <br />pay items. <br />Visit the site and verify contractual documents <br />to provide accurate and timely responses. <br />5.Task/Deliverable: Quantity Take- <br />off <br />• Perform an Independent Quantity Take -off <br />of all items of work on the Project and make <br />updates to engineer's estimate for current unit <br />pricing. <br />• Independent quantity calculations of bid items. <br />6.Task/Deliverable: Budget <br />• Update and modify the cost estimate and <br />contract documents according to the findings. <br />• Prior to construction advertisement, verify <br />and updated as needed the cost estimate and <br />contract documents. <br />SYRUSA <br />PAGE I31A <br />
The URL can be used to link to this page
Your browser does not support the video tag.