Laserfiche WebLink
7.Task/Deliverable: List of <br />Findings <br />Prepare and submit an itemized list of findings <br />and outline recommendations to reconcile <br />issues discovered and generally to expedite <br />the project. If it is more efficient to make <br />changes directly on the contract documents, <br />then show changes made on the documents. <br />Review the plans and contract documents, <br />communicate expectations with contractor, <br />evaluating schedule, and monitor for <br />compliance. <br />8.Task/Deliverable: Plan Review <br />• Conduct site visit/field reviews as part of <br />the plan review to identify any current field <br />conditions not reflected on the Plans. <br />• Utilizing drone services and lidar technology to <br />identify current field conditions and continuity <br />with plans. <br />g.Task/Deliverable: Materials <br />Review <br />• Identify the elements of construction that could <br />be substituted with more efficient materials <br />and associated methods. <br />• By proposing material and methods prior to <br />construction advertisement, the City benefits <br />from the savings. <br />10.Task/Deliverable: Geotechnical <br />• Review of Geotechnical report and the <br />structural calculations for the purposes of the <br />expected constructability review. <br />• Review contract documents and clarify before <br />going out to bid for construction. <br />11. Task/Deliverable: Environmental <br />Permitting <br />• Review of the NEPA and CEQA documents <br />for purposes of the expected constructability <br />review and expectation of the Project. <br />• Ensure all environmental compliance are met <br />and included in the Project contract document <br />of the following, but not limited to the <br />Mitigation Monitoring and Reporting Program, <br />(MMRP), Environmental Commitments Record <br />(ECR), and permitting agency guidelines and <br />their Special Provisions. It is the Consultant's <br />responsibility to bring on board environmental <br />sub consultant to prepare any pre -construction <br />report/work plan and monitor contractor's <br />mitigation compliance work performed. <br />• Providing constructability review comments <br />for the environmental documents prior to <br />advertisement. <br />• Prepare any pre -construction reportiwork <br />plan and monitor prior to advertisement. <br />contractor's mitigation compliance work <br />performed. <br />During the pre -construction phase on the 1-15 Cenda Ditch Bridge Replacement and Widening over <br />Wheaton Wash Project When SYRUSA visited the site, we identified severe weather conditions <br />from 120-degree heat during summer months to 27-degree freeze conditions during winter in this <br />environmentally sensitive area, high water table at 5' deep from ground level, which requires daily <br />dewatering. The potential risks of schedule delays and budget increases were mitigated through meetings <br />and communication with the designer, and ultimately updating the special provisions to adequately <br />address the environmental, temperature and ground water concerns, which saved project time and cost <br />that would have been encountered as a change order. <br />SYRUSA°•=3,.J PAGE 132 <br />