My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Fiscal Year 2023-24 Homeownership Initiatives
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 10 - Fiscal Year 2023-24 Homeownership Initiatives
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:10:03 PM
Creation date
10/11/2023 3:18:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
10
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />New Windows <br />Reputable manufacturer. <br />EPA Enerav Star aualified. <br />Minimum Standard . <br />Homes built before 1978 must comply with 24 CFR Part 35 Subpart J I <br />and HUD's Lead Safe Housing Rule regarding the evaluation and <br />control of lead -based paint hazards. <br />• <br />All exterior paint shall be intact and free of corrosion. <br />• <br />Five or more years of practical utility. <br />Rehabilitation . <br />All surfaces to be painted shall be prepared properly. All loose material <br />and peeling paint shall be removed. <br />• <br />All holes and cracks shall be filled and finished so that they blend into the <br />surrounding area. <br />• <br />All stucco surfaces to be painted shall receive a complete and even <br />coverage of stucco paint. <br />• <br />All wood surfaces to be painted shall receive a complete and even <br />coverage of flat exterior paint. <br />• <br />Poor workmanship will not be tolerated. <br />New Paint • <br />Reputable manufacturer. <br />• <br />Highest quality available. <br />• <br />Zero or low VOC paint, caulking and fillers. <br />WALLSCOVERINGS <br />Minimum Standard . Safe and structurally sound. <br />• All plaster, drywall and paneling shall be safe and intact. <br />Rehabilitation Walls and wall coverings that do not meet the minimum standard shall <br />be replaced. Practical, cost effective repairs are acceptable as long as <br />compliance with the minimum standard will be achieved. <br />• If the project involves a gut rehab, the attic, walls and floor on raised <br />foundations shall be insulated. <br />Minimum Standard • Safe, sound and sanitary. <br />• Five or more years of practical utility. <br />" Rehabilitation Floor coverings that do not meet the minimum standard shall be <br />replaced. Practical, cost effective repairs are acceptable as long as <br />compliance with the minimum standard will be achieved. <br />Replacement Floor • Carpet & Pad (Reputable manufacturer, recycled materials). <br />Coverings . Resilient Flooring (Reputable manufacturer, 10 year wear warranty). <br />• Ceramic Tile (Reputable manufacturer) J <br />• - • • <br />Minimum Standard . Safe, sound and in good working order. <br />• Five or more years of practical utility. <br />" Rehabilitation . Interior doors that do not meet the minimum standard shall be replaced. <br />Practical, cost effective repairs are acceptable as long as compliance <br />with the minimum standard will be achieved. <br />Replacement Doors & Doors (Reputable manufacturer, masonite, raised panel). <br />Hardware Hardware (Reputable manufacturer, lifetime finish). <br />City of Santa Ana Community Development Agency <br />Request for Proposals for Affordable Homeownership Opportunities <br />Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.