My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Award Agreement to Athens Services to Provide Street Sweeping Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/29/2023 Special
>
Item 11 - Award Agreement to Athens Services to Provide Street Sweeping Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 12:53:05 PM
Creation date
10/25/2023 12:39:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
8/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />the sweeping path by the operator rather than going around them. Immovable items that <br />impede sweeping such as construction debris and areas of impaired vertical or horizontal <br />clearance caused by tree limbs shall be reported to the Project Manager or designee <br />immediately for correction. <br />3.Contractor is not responsible for areas missed due to parked cars or other personal <br />property. <br />4.Standards, schedules, and frequencies may be modified from time to time as deemed <br />necessary by the City to ensure the Contractor’s conformance with the standard of care <br />specified in in Section 3.2.7 of the Agreement. <br />5.Due to different street widths throughout the City, street sweeping may require slower travel <br />speed and/or multiple passes by the sweeper, in many cases, to ensure curb-to-curb <br />coverage of the street. <br />6.Streets with raised medians (commercial and residential) shall have their curb-gutter <br />perimeter swept, including turnouts. <br />7.Street grade striped medians shall be swept in their entirety. <br />8.All deposits within intersections shall be removed as part of the sweeping operations. <br />9.Each street shall be swept clean to the adjacent property line. If a swept area is deemed <br />by the Project Manager or designee as failing to conform to the standard of care specified <br />in in Section 3.2.7 of the Agreement, the substandard section shall be re-swept before the <br />end of the day at no charge to the City. <br />The determination of acceptable performance in accordance with standard of care specified in <br />in Section 3.2.7 of the Agreement is at the sole, reasonable discretion of the City. Contractor <br />shall re-sweep at their own expense. The Project Manager or designee shall be notified of the <br />completed re-sweep. Swept clean means clean street with debris trails left behind. Any <br />sweeper used must not blow debris onto private property. <br />VI.GLOBAL POSITIONING SYSTEM (GPS) <br />1.The Contractor shall provide automatic vehicle location device (vehicle location and <br />management system [e.g., GPS]) on all street sweeper units, including subcontractors. <br />This device shall be placed on all sweeping equipment assigned to the City at the <br />Contractor's cost. <br />2.Contractor shall provide associated easy to use, cloud based software programs, which <br />will report all street sweeping activity and is accessible from web browsers on a variety <br />of desktop, laptop and mobile devices. The associated software shall be provided at no <br />cost to the City including monthly monitoring charges. The Contractor shall provide <br />software and licensing for a minimum of five (5) City users. <br />3.Software shall be capable of demonstrating real-time location, speed and path of travel of <br />equipment equipped with GPS systems. Software shall be capable of recording and <br />printing daily activity logs indicating actual miles traveled, streets swept, curb miles swept, <br />brooms up or down, the direction and speed of travel, ground speed of equipment, the <br />location of equipment at any given time and any other information that is suitable for <br />documenting actual work performed by the Contractor under this agreement. <br />4.Contractor shall have a tachograph system to backup GPS in the event of a system failure <br />and shall submit an initialed tachograph chart for any period of work with the monthly <br />invoice for any day of work that the GPS system is non-operational. <br />5.Contractor shall provide adequate training on an annual basis for City staff in the operation <br />and use of this system and allow City of Santa Ana Public Works Maintenance division
The URL can be used to link to this page
Your browser does not support the video tag.