Laserfiche WebLink
<br /> <br />Proposal for the City of Santa Ana, CA <br />Page 14 <br />PROJECT SCHEDULE RCS’ references will attest that our timelines are ideal for impact fee studies. This schedule, of course, will require the cooperative participation of City staff. We will be having meetings with staff every two to three weeks and provide them with updates. Department meetings will be 30 minutes to two hours each. RCS will comply with local, county, and state protocols for safely conducting meetings as the COVID-19 pandemic evolves. <br /> <br />Development Impact Fee Study Nov <br />2023 <br />Dec <br />2023 <br />Jan <br />2024 <br />Feb <br />2024 <br />Mar <br />2024 <br />Apr <br />2024 Land-use Database Compilation Determine Infrastructure LOS Discuss Desired Projects w. Staff Review Project Costs & Descriptions Review Demand Drivers (Nexus) Apply Nexus Distribution Factors Review Draft DIF Report with Staff Prepare Final DIF Report <br />Present DIF Study to Council <br />  <br />  <br />City Council 27 – 16 11/7/2023