My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal <br /> Roberts DATE:7/26/2023 <br /> INCORPORATED <br /> main nG.111ma u471uin <br /> T.E. Roberts, Inc. <br /> 17771 Mitchell Forth <br /> Irvine, CA 92614 <br /> Phone (714) 669-0072 Fax (714) 200-0241 <br /> TO: <br /> Edward A. Torres - Senior Engineer FOR: Items to complete work and MWD Requests <br /> Public Works Agency I CIP Delivery Engineering <br /> 20 Ci0c Center Plaza, M-36 I Santa Ana, CA 92702 <br /> (office) 714-647-5018 <br /> (Mobile) 714-719-0013 <br /> ATTN: Mike/ Emin/ E.Torres <br /> DESCRIPTION Unit Qty Total <br /> (Estimate) <br /> Engineered Shoring Plans for Options 1 LS $7,290.00 <br /> Submission &Additional MWD requests & Shoring 1 LS $6,S00.00 <br /> Requirements <br /> Additional 45 Degree Bends A & B 1 LS $8,174.60 <br /> Additional Fabrication Per MWD Change 1 LS 1 $9,320.00 <br /> Abandon Previously Installed Pipeline 1 LS $5,500.00 <br /> Remove & Dispose of Conflicting Concrete 1 LS $31,239.00 <br /> Remove & Dispose of Conflict Vault 1 LS $12,500.00 <br /> Line-Item Adjustments to accommodate balance of <br /> work <br /> BI#1 Mobilization 1 LS $15,000.00 <br /> BI#21 Traffic Control 1 LS $3,600.00 <br /> BI#27 Dewatering 1 LS $4,000.00 <br /> Credit for BI# Construct 4" Bottom Drain Blow-off Assembly 1 LS ($22,300.00) <br /> TOTAL $80,823.64 <br /> City Council 10 — 37 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.