Laserfiche WebLink
ITEM 1.1 WORK STOPPAGE TO ACCOMMODATE MWD REQUIRED CHANGES <br /> TE0 <br /> Roberts <br /> INCORPORATED <br /> Santa Ana Request:T.E. Roberts had to hold installation of vault piping connections due to unforeseen conditions at vault connection <br /> location.Crew(at the City's direction)shifted focus on discovery for information to provide to Metropolitan water in order to propose <br /> revised connections.T.E. Roberts(at the City's direction)pulled all shoring, backfilled,and demobilized from project site. Site was base <br /> paved in order to secure while MWD option was selected. <br /> 12/08/2023(Friday)Vault Work:$12,116.35 <br /> 12/13/2023(Wednesday)Vault Work:$9,610.38 <br /> 12/14/2023(Thursday)Vault Work:$22,039.47 <br /> 12/15/2023(Friday)Demobilization:$3,747.97 <br /> 01/04/2024(Thursday)SR-5 Vault:$3,092.19 <br /> 01/16/2024(Tuesday)Demobilization:$5,166.65 <br /> Cost Total <br /> Item 1.1 Request$55,773.01 <br /> (Supporting Documents Previously Provided to Santa Ana) <br /> City Council 10 —40 5/21/2024 <br />