My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 1.1 WORK STOPPAGE TO ACCOMMODATE MWD REQUIRED CHANGES <br /> 12/13/2023 (Wednesday) Vault Work - <br /> Arrived on job site and set up traffic control <br /> with a lane closure. Removed fence panels <br /> around shield box. Removed steel plate off <br /> top of the shield box. Pumped ground water <br /> into water truck. Removed blind screw plug <br /> from pipe stub. Plugged pipe stub with 1 LS 9,610.38 9,610.38 <br /> concrete block and mortar. Removed plates <br /> from trench line to remove jacks, base and <br /> start backfilling trench. Re-plated trench and <br /> shield box. Placed fencing around shield box. <br /> Cleaned up and secured job site. Took down <br /> traffic control. <br /> 12/14/2023 (Thursday) Vault Work - <br /> Arrived on job site and set up traffic control <br /> with a lane closure. Removed fencing around <br /> shield box. Pumped water down to place <br /> sand around pipe stub. Pulled shield boxes <br /> out, backfilled with base and compacted. <br /> Pulled plates around shield box and trench. 1 LS 22,039.4 22,039.47 <br /> Backfilled trench with sand & base and 7 <br /> compacted. Prepped trench and shield box <br /> area to temp pave. Loaded up and hauled K- <br /> rails, shield boxes, plates and fencing off of <br /> street. Cleaned up and secured job site. <br /> Took down traffic control. Demobilized <br /> equipment back to yard. <br /> 12/15/2023 (Friday) Demobilization - - <br /> Arrived on job site and loaded traffic control. <br /> Moved equipment and traffic control out of <br /> the yard. Hauled off material from yard. 1 LS 3,747.97 3,747.97 <br /> Covered piles of spoils with plastic and <br /> sandbags. Demobilized awaiting further <br /> instruction. Cleaned up and secured job site. <br /> 01/04/2024 (Thursday) SR-5 Vault - <br /> Arrived on job site and set up traffic control <br /> with multiple lane closures to access water <br /> vault. Set up tripod with wrench and gas <br /> monitor. Once inside of vault took multiple 1 LS 3,092.19 3,092.19 <br /> measurements of fittings and vault. (Length, <br /> width, thickness, vertical and horizontal, <br /> etc.) Cleaned up and secured job site. Took <br /> down traffic control. <br /> City Council 10 —42 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.