ITEM 1.2A REVISED MWD CONNECTION
<br /> Roberts
<br /> INCORPORATED
<br /> 17771 MI[ahell North COR #
<br /> Irvine,CA 92614 5866
<br /> Santa Ana- SA-5 vault Modifications
<br /> Name on Paperwork
<br /> Days Ext:
<br /> DATE:
<br /> LOCATION:
<br /> DETAILS: (Day TBD)-Estmated labor,equipment,and materailto:
<br /> Remohifte
<br /> Shore&Excavate
<br /> Install New Spool and make connection
<br /> TYPE TOTAL(S)
<br /> RATEIHR QTY REG AMT OT RATE QTY OT AMT DT RATE QTY DT AMT TOTAL
<br /> LABOR
<br /> FOREMAN/OPERATING ENG. 40.00 139.22 40.00 5,568.80 208.83 - 278.44 - 5,568.80
<br /> L4-PIPELAYER/As Phalt wkr 40.00 107.11 40.00 4,284.40 160.67 - 214.22 - 4,284.40
<br /> Ll-LABORER() 40.00 105.80 40.00 4,232.00 158.70 - 211.60 - 4,232.00
<br /> TRUCK DRIVER() 40.00 106.22 40.00 4,248.80 159.33 - 212.44 - 4,248.80
<br /> EQPT OPERATOR�) 40.00 134.81 40.00 5,392.40 202.22 - 269.62 - 5,392.40
<br /> L5-WELDER 16.00 106.67 16.00 1,706.72 160.01 213.34 1,706.72
<br /> 216.00 216.00 - - -
<br /> LABOR TOTAL $25,433.12
<br /> EQUIPMENT
<br /> SERVICE TRUCK(1) 52.02 40.00 2,080.80 2,080.80
<br /> PICKUP TRUCK/VAN 43.51 40.00 1,740.40 1,740.40
<br /> ARROW BOARD(3) 17.50 120.00 2,100.00 2,100.00
<br /> FLATBED TRUCK 47.21 8.00 377.68 377.68
<br /> BACKHOE 86.98 40.00 3,479.20 3,479.20
<br /> LOADER 121.95 40.00 4,878.00 4,878.00
<br /> DU MP TRU CK,Bobtail 66.11 40.00 2,644.40 2,644.40
<br /> TREN CH SHIELD(2) 37.50 80.00 3,000.00 3,000.00
<br /> WELDING TRUCK 47:25 16.00 756.00 756.00
<br /> WATERTR UCK 67.14 40.00 2,685.60 2,685.60
<br /> CONFINED SPACE EQPT 37.10 16.00 593.60 593.60
<br /> CRASH BARRELS(6) 11.25 240.00 2,700.00 2,700.00
<br /> K-RAIL(4) 7.56 160.00 1,209.60 1,209.60
<br /> DELINEATORS/SIGNS(31) 0.35 1,240.00 434.00 434.00
<br /> TRAFFIC CONES(63) 0.35 2,520.00 882.00 882.00
<br /> VACFORTRUCK 293.48 20.00 5,869.60 5,869.60
<br /> FENCE PANELS(10) 1.95 400.00 780.00 780.00
<br /> SKID STEER 48.32 8.00 386.56 386.56
<br /> ASPHALTZIP PER 98.38 8.00 787.04 787.04
<br /> VI BRATORY ROLLER 35.59 8.00 284.72 284.72
<br /> PAVING MACHINE 243.29 8.00 1,946.32 1,946.32
<br /> EQPT TOTAL $39,615.52
<br /> 50/0
<br /> MATERIAL sub Total Tax AMOUNT 150/0 TOTAL
<br /> West Coast Vault Piping 27,460.00 2,402.75 29,862.75 4,479.41 34,342.16
<br /> MATERIAL TOTAL $34,342.16
<br /> SUBTOTAL $99,390.80
<br /> 1%-Bond $993.91
<br /> 6 V
<br /> Fuel Charge $2,376.93
<br /> GRAND TOTAL 1 $102,761.64
<br /> City Council 10 -45 5/21/2024
<br /> Page 1 of 1
<br />
|