Laserfiche WebLink
DAILY EXTRA WORD REPORT <br />Contractor: Lonerock, Inc. Report No.: o� Z �- 2- <br />Project. Warner Avenue Improvements Project PCO#: REL24f �Z- 6' <br />Project No.: 14.6802; 18-642.4.; 20-6618 Revision: 2/1/2023 <br />Owner: City of Santa: Ana Date: 2/01/1023 <br />Description of Work: Preparing and removing sharing boxes fortransit9onal structure per RF1 <br />and removing asphaitfrorn the Oak road <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119.42 <br />$162.78 <br />$955.36 <br />Guillermo Saldana (Operator) <br />5 <br />$119.42 <br />$162.78 <br />597.10 <br />Ramon Guilien (Foreman Mason) <br />$99.94 <br />$135.07 <br />0,00 <br />Salvador Saldana {tabor IV) <br />$92.57 <br />$125,81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />$0.00 <br />Ramon Guillen Jr- {Mason} <br />3 <br />$93.83 <br />$125.90 <br />$281-49 <br />Crux Benavente Chan (App) <br />5 <br />$71.25 <br />$98.67 <br />$356.25 <br />Peter Arroyo (App) <br />$71.25 <br />$98.67 <br />$0.00 <br />Jesus Gomez (Labor IV) <br />6 <br />$92.57 <br />$125.81 <br />555.42 <br />Jorge Alejandres (Labor App IV) <br />2 <br />$71.25 <br />$98.67 <br />$142.50 <br />$0.00 <br />* Explain Additional Benefit: <br />SUBTOTAL <br />$2,888.12 <br />MU 20% <br />$577.62 <br />{ - <br />TOTAL LABOR <br />$3,465.74 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />❑PP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />2 <br />$187.52 <br />$375.04 <br />CAT 345CL Excavator <br />$256.50 <br />$0.0o <br />CAT 415F Skip Loader <br />$47.87 <br />0-0 <br />CAT 45OF Backhoe Loader <br />2 <br />1 $83.95 <br />$167.90 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />TO 00 <br />CAT 972H Loader <br />$206,74 <br />$0.00 <br />CAT 282D Skiff Steer Loader <br />$40.25 <br />$1D.00 <br />CAT CB24B Railer <br />$38.72 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />woo <br />Dump Truck 2 axle <br />2 <br />$50.64 <br />$10118 <br />Crew Truck 20000 LB <br />4 <br />$37.19 <br />$148-76 <br />a er Truck 36000 LB <br />$46.04 <br />CAT 315F <br />2.5 <br />$61.38 <br />$153.4 <br />H100 Hammer 2 $19.84 <br />" Explain Other Costs: SUBTOTAL <br />MU 15%u <br />TOTAL EQUIPMENT <br />$39,68 <br />$96&11 <br />$147.92 <br />$1,134.03 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Pending <br />$0.00 <br />SUBTOTAL <br />$0.00 <br />$0.00 <br />MU 15%0 <br />$0.00 <br />$0-00 <br />TOTAL MATERIAL <br />OTHEFdWORK <br />UNITS <br />UVT OTHER <br />QTY. PRICE COSTS* <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />0.00 <br />* Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORT{ <br />$0.00 <br />$0.00 <br />$0-00 <br />If Above Record is Complete and Correct <br />Contractor's Representative <br />Owners Representative <br />TOTAL LABOR <br />$3,405.14 <br />TOAL EQUIPMENT <br />$1.134,03 <br />TOTAL. MATERIAL <br />$0.00 <br />BOND 1% <br />$46-00 <br />TOTAL THIS PROPOSAL $4, 45.77 <br />