My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.. <br />Project. Warner Avenue Improvements Project PCO#. R4� f' <br />Project No.: 14-6802; 18-6424; 20.6618 Revision: 2/1/2023 <br />Owner: City of Santa Ana Date: 2/0111023 <br />Description of Work: Open existing water line on Oak road for installation Endcap retated <br />to construction of Transitional structure per RPI 7+4 <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Jahn Williams (Operator) <br />0 <br />$119A2 <br />162-78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />3 <br />$119-42 <br />, 162.78 <br />$358.26 <br />Ramon Guillen (Foreman Mason) <br />$99.94 <br />$135-07 <br />$0-00 <br />Salvador Saldana (Labor IV) <br />4 <br />$92-57 <br />$125.81 <br />$370.28 <br />Ricardo Gulllen (Cement Mason) <br />4 <br />$93.83 <br />$125.90 <br />$375,32 <br />Raman Guiflen Jr. (Mason) <br />5 <br />$93.83 <br />$125-90 <br />$469,15 <br />Cruz Benavente Chan (App) <br />3 <br />$$71-25 <br />$98.E7 <br />$2 3.75 <br />Peter Arroyo {App} <br />$71.25 <br />$98.67 <br />0-00 <br />Jesus Gomez (Labor IV) <br />2 <br />$92-57 <br />$125.81 <br />$185.14 <br />Jorge Alejandres (Labor App IV) <br />1 6 <br />1 $71.25 <br />$98.67 <br />27.50 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />$2,399.40 <br />MU 20% <br />$479.88 <br />TOTAL LABOR <br />$2,879.28 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS- <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />AT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />$256.50 <br />To 00 <br />CAT 415F Skip Loader <br />2 <br />$47.87 <br />$95-74 <br />CAT 45OF Backhoe Loader <br />1 <br />$83.95 <br />83. 55 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0-00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />$206,74 <br />$0-00 <br />CAT 262D Skid Steer Loader <br />2 <br />$40-25 <br />$80-50 <br />CAT 06248 Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />1 <br />$50.64 <br />$50.64 <br />Crew Truck 20000 LS <br />4 <br />$37.19 <br />148.76 <br />Ater Truck 36000 LB <br />1 <br />$45.04 <br />CAT 315F <br />1 <br />$61.38 <br />$61.38 <br />H 100 Hammer 1 $19.84 <br />Explain Other Costs: <br />SUBTOTAL <br />$19.84 <br />$585.85_ <br />$87.88 <br />MU 15% <br />TOTAL <br />EQUIPMENT <br />$673.73 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Pending <br />$0•00 <br />SUBTOTAL <br />MU 15% <br />$0.00 <br />$0.00 <br />$0.00 <br />T$0.00 <br />TOTAL MATERIAL <br />OTHER WORK <br />UNITS <br />OTY. <br />UNIT <br />PRICE <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$0.00 <br />' Explain Other Costs. <br />SUBTOTAL <br />$0.00 <br />MU 15%i <br />$0.00 <br />TOTAL OTHER Wbffk <br />$0.00 <br />It Above Record is Complete and Correct <br />Contraetoes Representative ) <br />r'� f <br />er's Representative <br />a-�,� <br />t- <br />UTAL L.AMUJd L,2Sly.1tS <br />TOAL EQUIPMENT $673.73 <br />TOTAL MATERIAL $0.00 <br />BOND 1% $35.53 <br />TOTAL THIS PROPOSAL 3,58 .54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.