Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: -9Z.- 2 4 `' <br />Project: Warner Avenue improvements Project PCO#: FED- 7 <br />Project No.,.14-6802; 18-5424; 20-6618 Revision: 21212023 <br />Owner: City of Santa Ana Date: 2023 <br />Description of Work: Open existing water tine an Oak road for lastalladon Endcap related <br />to construction of Transitional structure per RFI 24 <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Sohn Williams (Operator) <br />Guillermo Saidana (Operator) <br />Ramon Guillen (Foreman Mason <br />Salvador Saidana (Labor IV) <br />Ricardo Guillen (Cement Mason) <br />Raman Guillen Jr. (Mason) <br />Cruz Benavente Chan (Apo) <br />2 <br />6 <br />6 <br />0 <br />0 <br />8 <br />0 <br />' <br />1 9.42 <br />T 19,42 <br />$99.94 <br />$92.57 <br />$93.83 <br />$93,83 <br />$71.25 <br />$162.78 <br />162.78 <br />$135,07 <br />$125.81 <br />$125.90 <br />$125.90 <br />$98.67 <br />23 .84 <br />$7 16.52 <br />599-64 <br />0-00 <br />$0.00 <br />$750,94 <br />$0.00 <br />Peter Arroyo (App) <br />Jesus Gomez (Labor IV) <br />8 <br />, <br />$7115 <br />$92.57 <br />$98.67 <br />$125-81 <br />$0.00 <br />555.42 <br />Jorge Alejandres (Labor App IV) <br />6 <br />. <br />$71-25 <br />$98.67 <br />$427,50 <br />$0.00 <br />"Explain Additional Benefit: <br />SUBTOTAL <br />$3,288.56 <br />MU 20% <br />$657.71 <br />$3,946.27 <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />$BY OPP. <br />HRS. HRS. <br />$6Y <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />CAT 33 L Excavator <br />$'f 87.5 <br />0.00 <br />CAT 345CL Excavator <br />$258,50 <br />$0.00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0.00 <br />CAT 450F Backhoe Loader <br />0 <br />$83.95 <br />$0.0 <br />GAT 450E Backhoe Loader <br />$63.95 <br />$0.00 <br />CAT 950H Loader <br />1 <br />$136.17 <br />$136.17 <br />CAT 972H Loader <br />$206.74 <br />70,00 <br />CAT 262D' Skid Steer Loader <br />6 <br />$40.25 <br />$241,90 <br />CAT CB248 Roller <br />$38.72 <br />$0.00 <br />Air Compressor 1 B5 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />Grew Truck 20000 LS <br />0 <br />0 <br />$50.64 <br />$37.19 <br />$0.0 <br />0-00 <br />Water Truck2 <br />=$45.04 <br />SUM <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />Hi 00 Hammer 0 $19.84 <br />" Explain Other Casts: <br />TOTAL <br />SUBTOTAL <br />0.00 <br />$467.75 <br />MU 15% <br />$70.16 <br />EQUIPMENT <br />$537.91 <br />MATERIAL <br />Description (Attach invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Concrete <br />1 <br />1,152.80 <br />$1,152.80 <br />Sand <br />c <br />2 <br />43.00 <br />$86.00 <br />fittings <br />LS <br />1 <br />2,500.00 <br />$2,500.00 <br />CMS cy <br />3 <br />30.00 <br />SUBTOTAL <br />$90.00 <br />$3,828.80 <br />MU 15°% <br />$574.32 <br />TOTAL MATERIAL <br />$4,403.12 <br />OTHER WORK <br />UNITS <br />UNIT <br />QTY. PRICE <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />0. 0 <br />$0.00 <br />Explain Other Costs. <br />SUBTOTAL <br />$0.00 <br />MU 16% <br />$0.00 <br />TOTAL OTHER WORT[ <br />r a r.rrn <br />$0.00 <br />R`9 A.12 'l7 <br />if Above Record is Complete ono L:orrect <br />Contraaers RapreseriWtive <br />' pwnarg Repre�Saji�¢� <br />1VrML a..novn W" -.. , <br />TOAL EQUIPMENT $537.91 <br />TOTAL MATERIAL $4,403.12 <br />BOND 1% $58.87 <br />TOTAL THIS PROPOSAL $8,976.181 <br />