Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.; -0- ? � <br />Project; Warner Avenue Improvements Project PC❑#; 2 <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 2/3/2023 <br />Owner: City of Santa Ana Date: 2/03/1023 <br />Description of Work: Excavated trench for transitional structure, and instaling shoring per <br />RFI 24 <br />LABOR <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />EXTENDED <br />Name & Classification <br />Regular OT <br />Regular <br />OT <br />BENEFIT' <br />AMOUNTS <br />John Williams (Operator) <br />1.5 <br />$119-42 <br />$162.78 <br />$179.13 <br />Guillermo Saidana (Operator) <br />0 <br />$119,42 <br />$152.78 <br />$0.00 <br />Ramon Guillen (Foreman Mason) <br />1.5 <br />$99.94 <br />$135.07 <br />$149.91 <br />Salvador Saidana (Labor IV) <br />$92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125-90 <br />$0.00 <br />Raman Guillen Jr- (Mason) <br />1.5 ;' <br />$93-83 <br />$125.90 <br />$140.75 <br />Cruz Henavente Chan (App) <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />Peter Arroyo (App) <br />$71.25 <br />$98.67 <br />$0-00 <br />Jesus Gomez (Labor IV) <br />057 <br />$125-81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />1.5 <br />$71. 55 <br />$98-67 <br />$106.88 <br />$0.00 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />$576,66 <br />MU 20% <br />$115.33 <br />- <br />$691.99 <br />TOTAL LABOR <br />EQUIPMENT <br />SBY OPP. <br />SBY <br />OPR <br />OTHER <br />EXTENDED <br />Description <br />HRS, HRS- <br />COST <br />COST <br />COSTS' <br />AMOUNTS <br />CAT 336EL Excavator <br />$187-52 <br />$0.00 <br />CAT 345CL Excavator <br />1.5 <br />$256.50 <br />$384-75 <br />CAT 415F Skip Loader <br />547.87 <br />$0.00 <br />CAT 45OF Sackhoe Loader <br />0 <br />$83.95 <br />$0-00 <br />CAT 450E 13ackhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136-17 <br />$0.00 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0-00 <br />CAT CB243 Roller <br />$38-72 <br />$0.00 <br />Air Compressor 185 w/breaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />$0-00 <br />Crew Truck 200DO LB <br />0 <br />$37-19 <br />$0.00 <br />Water Truck 36000 <br />45• <br />CAT 315F <br />0 <br />$61.38 <br />$0-00 <br />H100 tlamrrier <br />❑ <br />$19.24 <br />$0.00 <br />$394.75 <br />Explain Other Costs: <br />SUBTOTAL <br />MU 15% <br />$57.71 <br />_ ...._.._-.. <br />- <br />TOTAL <br />_ <br />EQUIPMENT <br />$442.46 <br />MATERIAL <br />UNIT <br />EXTENDED <br />Description (Attach Invoice) <br />UNITS <br />QTY- <br />PRICE <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385,00 <br />J�L1 <br />- <br />$0.00 <br />= - - <br />StH�TG-TAL <br />$57.75 <br />MU 15% <br />TOTAL <br />MATERIAL <br />$442-75 <br />OTHER WORK <br />UNIT <br />OTHER <br />EXTENDED <br />UNITS <br />QTY, <br />PRICE <br />I COSTS' <br />AMOUNTS <br />' Explain Other Costs: SUBTOTAL $0-00 <br />MU 15% $0.00 <br />TOTAL OTHER WORK $0.00 <br />If Above Re card is Complete and Correct TOTAL LABOR $691-99 <br />TOAL EQUIPMENT $442.46 <br />on"Qtors Representative TOTAL MATERIAL $442.75 <br />�r BOND 1% $16.77 <br />er's Representative TOTAL THIS PROPOSAL $1,592-98 <br />