Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: � 2 7 7 <br />Project: Warner Avenue improvements Project PCO#: <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 2/6/2023 <br />Owner: City of Santa Ana Date: 2/06/1023 <br />Description of Work: Excavated trench for transitional structure, and insta ling shoring per <br />RFI 24 (Oak Raoad) - Suport of the gas line and S.Sewer <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119-42 <br />$162-78 <br />$955.36 <br />Guillermo Saidana (Operator) <br />8 <br />$119-42 <br />$162.78 <br />$955.36 <br />Ramon Guillen [Foreman Mason] <br />8 <br />1 <br />$99.94 <br />$135.07 <br />799.52 <br />Salvador Saldana (Labor M <br />2 <br />$92.57 <br />$125.81 <br />$185.14 <br />Ricardo Guillen (Cement Mason) <br />8 <br />$93.83 <br />$125.90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />$93.83 <br />$125.90 <br />750-64 <br />Cruz Benavente Chan (App) <br />0 <br />$71.25 <br />$98.67 <br />$0-00 <br />Jesus Gomez (Labor IV) <br />2 <br />$92.57 <br />$125-81 <br />$18574 <br />Jorge Alejandres {Labor App IV] <br />8 <br />$71.25 1 <br />$98.57 <br />$570.00 <br />$0.00 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />MU 20% <br />TOTALLABORI <br />$5,151.80 <br />$1,030.36 <br />$6,182,16 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP, <br />HRS. <br />SBY <br />COST <br />()PP- <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052.00 <br />CAT 415F Skip Loader <br />$47-87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136-17 <br />$0-00 <br />CAT 972H Loader <br />8 <br />$206,74 <br />$1.653-92 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT C624B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />8 <br />$37.19 <br />$297,52 <br />Ater Truck 36000 L <br />4 ¢ <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />H 100 Hammer 0 <br />* Explain Other Costs- <br />$19.84 <br />SUBTOTAL <br />_ MU 15% <br />EQUIPMENT <br />$0.00 <br />$4,003-44 <br />$600.52 <br />$4,603.96 <br />TOTAL <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day 1 <br />385.00 <br />$385-00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$0.00 <br />$385,00 <br />$57.75 <br />$442.75 <br />OTHER WORK <br />UNITS <br />QTY, <br />UNIT <br />PRICE <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />$0-00 <br />$p.00 <br />* Explain Other Casts: _SUBTOTAL <br />- MU 15% <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct <br />Contractor's Representative <br />wner's Representative <br />►VIAL LACEUK Z to, Ioz. 10 <br />TOAL EQUIPMENT $4.603-96 <br />TOTAL fi7A TERIAL $442,75 <br />BOND 1 % $0.00 <br />TOTAL THIS PROPOSAL 1, 228.87 <br />