Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: l3fi' <br />Project. Warner Avenue Improvements Project PCO#: <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: W1012023 <br />Owner. City of Santa Ana Date: 2/10/1023 <br />Description of Work: Processing soil for transport (to wet) and preparing fiorm for the wall <br />per RFI 24 (Oak Road transitional structure) - transport panels to the site <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119A2 <br />$162.78 <br />3955.36 <br />Guillermo Saldana (Operator) <br />Q <br />$119-42 <br />$162.78 <br />$0.00 <br />Raman Guillen (Foreman Mason) <br />8 <br />$99-94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$125-81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />8 <br />$93-83 <br />$125-90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />$93.83 <br />$125,90 <br />$750-64 <br />Cruz Senavente Chan (App) <br />8 <br />$71.25 <br />$98.67 <br />$579A0 <br />Jesus Gomez (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (LaborApp IV) <br />8 <br />$71.25 <br />$98.67 <br />$570.00 <br />$0.00 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />MU 200% <br />TOTAL LABOR <br />$4,396.16 <br />$879.23 <br />$5,275.39 <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />OPP. <br />HRS- <br />SBY <br />COST <br />OPP- <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />6 <br />$256.50 <br />$1,539.00 <br />CAT 415F Skip Loader <br />$47-87 <br />$0-00 <br />CAT 450F Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />2 <br />$206-74 <br />$413.48 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Drew Truck 20000 LB <br />8 <br />$37.19 <br />$297.52 <br />Water Truck 36000 L8 <br />$45,04 <br />CAT 315F <br />0 <br />$61.38 <br />$0-00 <br />H100 Hammer <br />1 0 <br />$19.84 <br />$0.00 <br />' Explaln Other Costs- <br />TOTAL <br />SUBTOTAL <br />MI! 15% <br />EQUIPMENT <br />$2,256A0 <br />$337.50 <br />$2,587,50 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Sh0Fi119 <br />day <br />1 <br />385.00 <br />$385.00 <br />$0.00 <br />$0.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$385.00 <br />$57.75 <br />$442.75 <br />OTHER WORK <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />OTHER <br />COSTS' <br />EXTENDE❑ <br />AMOUNTS <br />$0.00 <br />$0- 00 <br />' Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OTHER WaRK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct <br />Contractors Representative <br />bwne�s Representative <br />TOTAL LABOR <br />$5.275-39 <br />TOAL EQUIPMENT <br />$2.587-50 <br />TOTAL MATERIAL <br />$442-75 <br />BOND 941a <br />$0.00 <br />TOTAL THIS PROPOSAL <br />8,305-64 <br />