My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCO#: ff� 2d- <br />Project NO- 14-6802; 18-6424, 2U-6618 Revision: 2/9/2023 <br />Owner: City of Santa Ana Date: 2/09/1023 <br />Description of Work: Excavated trench for transitional structure, and disposal of the soil <br />RFl 24 (Oak Road) - Placing 314' rock on bottom and install form for bottom slab <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119.42 <br />$162-78 <br />955-36 <br />Guillermo Saldana (Operator) <br />0 <br />$119-42 <br />$162.78 <br />0.00 <br />Ramon Guillen (Foreman Mason) <br />8 <br />$99-94 <br />$135-07 <br />$799-52 <br />Salvador Saldana (Labor IV) <br />0 <br />$92-57 <br />$125,81 <br />$0.00 <br />Ricardo Guillen (Cement Masan) <br />8 <br />$93.83 <br />$125,90 <br />$750,64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />$93.83 <br />$125.90 <br />$750.64 <br />Cruz Benavente Chan (App) <br />8 <br />$71-25 <br />$98.67 <br />$670.00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />$71.25 <br />$98-67 <br />$570,00 <br />$0.00 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />$4,39_6.16 <br />$879.23 <br />MU 20% <br />TOTAL LABOR <br />$5,275.39 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />qPP- <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$157.52 <br />$0. DO <br />CAT 345CL Excavator <br />5 <br />$256,50 <br />$1,282.50 <br />CAT 415F Skip Loader <br />$47.87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Sackhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.60 <br />CAT 972H Loader <br />3 <br />$206.74 <br />$620.22 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />8 <br />$37-19 <br />$297.52 <br />Water Truck 36000 LB <br />$45.04 <br />SUM <br />CAT 315F <br />0 <br />$61-38 <br />$0.00 <br />H100 Hammer <br />D <br />$19.84 <br />$0 00 <br />' Explain Other Costs: <br />TOTAL <br />SUBTOTAL <br />MU 15% <br />$2,200.24 <br />$330.04 <br />EQUIPMENT <br />$2,53&28 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />I <br />t]TY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385-0D <br />314" Rock <br />Cy <br />12 <br />45-00 <br />$540-00 <br />Trucking soil <br />trucks <br />2 <br />300.00 <br />$600.00 <br />Material <br />LS <br />1 <br />961-93 <br />$961.93 <br />_ SUBTOTAL <br />MU 15°% <br />TOTAL MATERIAL <br />$2.486.93 <br />$373-04 <br />$2,6%U <br />OTHER WORK <br />UNITS <br />CITY. <br />UNIT <br />PRICE <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />$0,00 <br />$0.00 <br />" Explain Other Costs' SUBTOTAL <br />MU 15% <br />- - - - TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct <br />- GontractorsRepresenlalive <br />Owners epresentative <br />TOTAL LABOR <br />$5,275.39 <br />TOAL EQUIPMENT <br />$2,530.26 <br />TOTAL MATERIAL <br />$2.859.97 <br />BOND 1% <br />$0.00 <br />TOTAL THIS PROPOSAL $10,665.64 <br />UJ&n if <br />on <br />FaotPm <br />
The URL can be used to link to this page
Your browser does not support the video tag.