Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCOM W+2-,r' 'Z <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 2/1512023 <br />Owner: City of Sang Ana Date: 2/15/1023 <br />Description of Work: Removed form from bottom slab and install form for the wall <br />per RFI 24 (Oak Road transitional structure)- disposed extra soil from the site <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Jahn Williams (Operator) <br />8 <br />119.42 <br />162.78 <br />$ 55-36 <br />Guillermo Saldana (Operator) <br />0 <br />$119.42 <br />$162-78 <br />$0.00 <br />Ramon Guillen (Foreman Mason) <br />8 <br />0 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana {Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125.90 <br />750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />0 <br />$93.83 <br />$125,90 <br />$750.64 <br />Cruz Benavente Chan (App) <br />8 <br />$71.25 <br />$98.67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />0 <br />$71.25 <br />$9$.67 <br />$570-00 <br />$0.06 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />MU 20°% <br />$4.396.16 <br />$879.23 <br />$5,275.39 <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />AT 336EL Excavator <br />187.52 <br />$0.0 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052,00 <br />CAT 415F Skip Loader <br />$47.87 <br />$o.00 <br />CAT 450F Backhoe Loader <br />0 <br />$83.95 <br />o0 <br />CAT 450E Backhoe Loader <br />$83.95 <br />0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />0-0a <br />CAT 2620 Skid Steer Loader <br />0 <br />$44.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0_/ <br />$%64 <br />$0,00 <br />Crew Truck 20000 LB <br />' .8 <br />$37.19 <br />$297,52 <br />Water Truck <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />Generator <br />8 <br />$7-50 <br />$60.00 <br />Explain Other Gvsts. <br />TOTAL <br />SUBTOTAL <br />MU 15% <br />$2,409Z2 <br />$361.43 <br />EQUIPMENT <br />$2,770.95 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385.00 <br />Material <br />LS <br />1 <br />5B8.50 <br />$588.50 <br />Concrete <br />ICY <br />0 <br />165-00 <br />$0.00 <br />SUBTOTAL <br />MU 15°% <br />TOTAL MATERIAL <br />$973-50 <br />$146.03 <br />$1.119,53 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />OTY. <br />0 <br />UNiT <br />PRICE <br />$0-00 <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />0 00 <br />Exposed soil <br />Load <br />16 <br />$300,00 <br />$5,400.00 <br />" Explain Other Costs: <br />-__ TOTAL <br />SUBTOTAL <br />MU 15°/n <br />OTHER WORK <br />_ $5,400.04 <br />$810.00 <br />$6,210.00 <br />If Above Record is Complete and Correct <br />CtracWeS Repres to <br />C]wrrar's R - resenkative <br />rOiALi-AisOR <br />$5,27D.3a <br />TOAL EQUIPMENT <br />$2,770.95 <br />TOTAL MATERIAL <br />$1,119-53 <br />ToalOter <br />$6,210.00 <br />TOTAL THIS PROPOSAL <br />15,375-87 <br />