Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />a" <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCOM 7- 6 <br />Project No.: 14-6802; 18-6424; 20.6618 Revision: 211612023 <br />Owner: City of Santa Ana Date: 2116/23 <br />Description of Work: Install farm for the wall <br />per RFI 24 (Oak Road transitional structure) -disposed soil from the site <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />❑T <br />John Williams (Operator) <br />8 <br />$119.42 <br />$162.78 <br />$955.36 <br />Guillermo Saldana (Operator) <br />0 <br />$119-42 <br />$162-78 <br />$0.00 <br />Raman Guillen (Foreman Mason) <br />8 <br />0 <br />$99.94 <br />$135,07 <br />$799.52 <br />Salvador Saidana (Labor IV) <br />0 <br />I <br />$92.57 <br />$126.81 <br />$a.00 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125-90 <br />$750-64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />0 <br />$93.83 <br />$125.90 <br />$750-64 <br />Cruz Benavente Chan (App) <br />8 <br />$71.25 <br />$98.67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92-57 <br />$125-81 <br />$0-00 <br />Jorge Alejandres (LaborApp IV) <br />8 <br />. 0 <br />$71.25 <br />$9&67 <br />$570.00 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />_ $4,396.16 <br />$5,275.323 <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPR <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 335EL Excavator <br />$187-52 <br />$0-00 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052-00 <br />CAT 415F Skip Loader <br />$47.87 <br />0.00 <br />CAT 450F i3ackhoe Loader <br />0 <br />$83-95 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 950H Loader <br />$136,17 <br />$D.Oo <br />CAT 972H Loader <br />0 <br />$206-74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40-25 <br />$0-00 <br />CAT CB24B Roller <br />$38.72 <br />$000 <br />Air Compressor 185 wlhreaker <br />$36.28 <br />0-0❑ <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />l! 8 <br />$37.19 <br />$297.52 <br />Water Truck 36000 LS <br />0 <br />$45-04 <br />CAT 315F <br />❑ <br />$61.38 <br />$0.00 <br />Generator <br />8 <br />$7.50 <br />$6000 <br />Explaln Other Costs: <br />TOTAL <br />SUBTOTAL <br />fMu 15%-- <br />_ $_ 2,448.52 <br />$361.43 <br />$2.770.95 <br />EQUIPMENT <br />MATERIAL <br />Description (Attach invoice) <br />UNITS <br />CITY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385-00 <br />Material <br />LS <br />1 <br />220-61 <br />$220-61 <br />Concrete <br />CY <br />01 <br />165.00 <br />$0.00 <br />SUBTOTAL <br />MU i5% <br />TOTAL MATERIAL <br />$605.61 <br />- $90.84 <br />$696.45 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />I <br />QTY- <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />$0-00 <br />Exposed sail <br />Load <br />16 <br />1 $300.00 <br />,800-00 <br />Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$4.800.00 <br />J $720.00 <br />$5,520.00 <br />If Above Record is Complete and Correct TOTAL LABOR $5,275.39 <br />TOAL EQUIPMENT $2,770.95 <br />y� Contractors Reprejfives ,V� d TOTAL MATERIAL $696A5 <br />ToalOter $5,520-00 <br />Y r7 .y <br />'a �p'wneYs Representative TOTAL T141S PROPOSAL $14,262-79 <br />