My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: 1-8- 2 1' ! <br />Project: Warner Avenue Improvements Project PCO#: RP-2* <br />Project No.: 14.6802; 18•6424; 20-6618 Revision: 3/3/2023 <br />Owner: City of Santa Ana Date: 313123 <br />Description of Work: Instal form for top slab of transitional structure, <br />per RFi 24 (Oak Road transitional structure) <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />119.42 <br />$162-78 <br />$955.36 <br />Guiiiermo Saldana (Operator) <br />8 <br />0 <br />$119. 22 <br />$162.78 <br />955.36 <br />Ramon Guillen (Foreman Mason) <br />8 <br />0 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor 1V) <br />8 <br />0 <br />$92.57 <br />$125.81 <br />$740-55 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125-90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 1 <br />0 <br />$93-83 <br />$125,90 <br />750.B4 <br />Cruz Benavente Chan (App) <br />8 <br />0 <br />$71.25 <br />$98.67 <br />$570.00 <br />Jesus Gomez (labor IV) <br />8 <br />0 <br />$92.57 <br />$125.81 <br />$740.56 <br />Jorge Alejandres (Labor App IV) <br />8 <br />0 <br />$7125 <br />$98.67 <br />$570.00 <br />* Explain Additional Benefit: <br />SUBTOTAL <br />$6,83Z.64 <br />MU 00°% <br />$1,366.53 <br />TOTAL LABOR <br />$8.199.17 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP- <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />9187.52 <br />$07 <br />CAT 345CL Excavator <br />8 <br />$256.60 <br />$2,052.00 <br />CAT 415E Skip Loader <br />8 <br />$47.87 <br />$382.96 <br />CAT 45OF Backhoe Loader <br />0 <br />$83.95 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />1 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />8 <br />$37.19 <br />297.52 <br />Water Truck 36000 LB <br />0 <br />$45.04 <br />CAT 315F <br />0 <br />$51-38 <br />$0.00 <br />Generator <br />8 <br />1 $7.50 <br />$60.00 <br />Explain Other Costs: <br />TOTAL <br />SUBTOTAL <br />MU 15la <br />$_2,792.48 <br />$418.87 <br />EDUIPMEFIT <br />$3,211,35 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />3$5.00 <br />$385.00 <br />Material <br />LS <br />1 <br />233.16i <br />$233.16 <br />Dump fees <br />LS <br />11 <br />805.50 <br />$805.50 <br />SUBTOTAL <br />MU 15°% <br />TOTAL MATERIAL <br />$1,423.66 <br />$213.55 <br />$1,637.21 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />QTY- <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$aao <br />Exposed soil <br />Load <br />0 <br />$300.00 <br />$0.00 <br />Explain Other Costs: SUBTOTAL <br />MU 1596 <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />0.00 <br />if Above Record is Complete and Correct <br />Ctracto <br />es Reressve <br />Rp <br />1Owner's ereseniave <br />TOTAL LABOR <br />$8,199.17 <br />TOAL EQUIPMENT <br />$3,211.35 <br />TOTAL MATERIAL <br />$1,637.21 <br />ToalOter <br />$0.00 <br />TOTAL THIS PROPOSAL $13,047.731 <br />
The URL can be used to link to this page
Your browser does not support the video tag.