My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCOM R 6 <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 3/2/2023 <br />Owner: City of Santa Ana Date: 312123 <br />Description of Work: Instal form for top slab of transitional structure, and backlill with 314 rock <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT` <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Jahn Williams {Operator} <br />0 <br />$119.42 <br />3162.78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />8 <br />0 <br />119.42 <br />$162.78 <br />$955.36 <br />Ramon Guillen (Foreman Mason) <br />8 <br />4 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor IV) <br />8 <br />0 <br />$92.57 <br />$125.81 <br />$740.56 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125.90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />0 <br />$93.83 <br />$125,90 <br />$750.64 <br />Cruz Benavente Chan (App) <br />8 <br />0 <br />$71.25 <br />$98.67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />8 <br />0 <br />$92.57 <br />$125.81 <br />$740.56 <br />Jorge Alejandres (Labor App IV) <br />81 <br />0 <br />$71.25 <br />$98.67 <br />$570.00 <br />$0.00 <br />Explain Additional Benefits <br />SUBTOTAL <br />$5,877.28 <br />$1,175.46 <br />MU 20% <br />TOTAL LABOR <br />$7,052.74 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />6 <br />$187.52 <br />$1.125.12 <br />CAT 345CL Excavator <br />0 <br />$256,50 <br />$0.00 <br />CAT 415F Skip Loader <br />$47.87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />1 <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />2 <br />$40.25 <br />$80.50 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlhreaker <br />$36.25 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />8 <br />$37.19 <br />$297.52 <br />Water Truck 36000 LB <br />W.04 <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />Generator <br />8 <br />1 $7.50 <br />$60.00 <br />` Explain Other Cysts. SUBTOTAL <br />MU 15% <br />EQUIPMENT <br />$1,563.14 <br />$234.47 <br />$1,797.61 <br />MATERIAL <br />Description (Attach Invoice) <br />:da: <br />ZTOTAIL <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />385.00 <br />$385.00 <br />Material <br />LS <br />1 <br />323.79 <br />$323.79 <br />314" rock <br />I <br />ICY <br />26.67 <br />45.00 <br />$1,200.15 <br />SUBTOTAL <br />VU 15% <br />TOTAL MATERIAL <br />$1,908.94 <br />$286.34 <br />$2,195.28 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />QTY. <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed soil <br />Load <br />0 <br />1 $300.00 <br />$0.00 <br />" Explain Other Costs' SUBTOTAL <br />MU 16% <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct TOTAL LABOR $�,0b2.l4 <br />TOAL EQUIPMENT $1,797.61 <br />C acto s RUve TOTAL MATERIAL $2,195.28 <br />Z77. ToalOter $0.00 <br />(7nets Representative TOTAL THIS PROPOSAL $11,045.53 <br />i. <br />D(z <br />�90If <br />M kq-F R r <br />L \` <br />�i <br />
The URL can be used to link to this page
Your browser does not support the video tag.