My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: 7 qq <br />Project: Warner Avenue Improvements Project PCO#: BD-- <br />zi <br />Project No.: 14-5802; 18.6424; 20.6618 Revision: 3/13/2023 <br />Owner: City of Santa Ana Date: 3l13123 <br />Description of Work: backfrll transitional structure, and remove form under top slag <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Jahn Williams (Operator) <br />8 <br />- <br />119-42 <br />$162.78 <br />$955-36 <br />Guillermo Saldana (Operator) <br />8 <br />' 0 <br />$119.42 <br />$162-78 <br />$955,36 <br />Ramon Guillen (Foreman Mason) <br />8 <br />0 <br />$99.94 <br />$135.07 <br />799-52 <br />Salvador Saldana (Labor IV) <br />8 <br />f 0 <br />$92.57 <br />$125-81 <br />$740,56 <br />Ricardo Guillen (Cement Mason) <br />8 <br />. 0 <br />$93.83 <br />$125-90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />0 <br />$93.83 <br />$125,90 <br />$750.64 <br />Cruz Senavente Chan (App) <br />8 <br />0 <br />$71-25 <br />$9$.67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />8 <br />0 <br />$92.57 <br />P25-81 <br />$740-56 <br />Jorge Alejandres (Labor App IV) <br />8 <br />0 <br />$71.25 <br />$98.67 <br />$570-00 <br />$0.00 <br />" Explain Additional Benefit <br />SUBTOTAL <br />MU 20% <br />TOTAL LABOR <br />$6,832.64 <br />$1,366.53 <br />$8,199.17 <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />OPP. I <br />HRS- <br />SBY <br />COST <br />DPP. <br />COST <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />❑ <br />$157.52 <br />$0.00 <br />CAT 345CL Excavator <br />8 <br />e <br />$256.50 <br />$2,052,00 <br />CAT 415E Skip Loader <br />4 <br />d <br />$47-87 <br />$191-48 <br />CAT 45OF Backhoe Loader <br />❑ <br />$83.95 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />4 <br />- <br />$136-17 <br />$544.68 <br />CAT 972H Loader <br />Q <br />$206.74 <br />$0-00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40-25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 L8 <br />8 <br />1 <br />$37-19 <br />$297.52 <br />ater ruo 36000 LB <br />0 <br />45. <br />CAT 315F <br />D <br />$61.38 <br />$0-00 <br />Generator <br />0 <br />$7.50 <br />$0.00 <br />• Explain Otner Casts: <br />TOTAL <br />SUBTOTAL <br />$3,086,68 <br />$4fi2.65 <br />$3,548.53 <br />MU 16% <br />EQUIPMENT <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />OTY, <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385.00 <br />3i4" crushed rock <br />cy1 <br />15 <br />45.00 <br />$675.00 <br />CMB <br />ICY <br />1 251 <br />25.00 <br />$625.00 <br />SUBTOTAL <br />_Mu u0% <br />TOTAL MATERIAL <br />$1,685.00 <br />$252.75 <br />$1,937-75 <br />OTHER WORT( <br />Concrete Pump <br />UNITS <br />LS <br />CITY <br />❑ <br />UNIT <br />PRICE <br />$0-00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.0❑ <br />Exposed soil <br />Load <br />0 <br />$300.00 <br />$0-00 <br />" Explain Other Costs: SUBTOTAL <br />MU 15% <br />- TOTAL OTHER WORK <br />_ $0-00 <br />$0.00 <br />$0.00 <br />mn a nn -r <br />If Above Record is Complete ano Correct <br />.v Con cmrs=spresenta `ve <br />r' �- <br />4-2 <br />F ' <br />Owne6 Representative <br />IVFtu. L-Ma.,R wU. , <br />TOAL EQUIPMENT $3,548.53 <br />TOTAL MATERIAL $1,937,75 <br />Total Otter $0-00 <br />TOTAL THIS PROPOSAL $13,685-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.