Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue Improvements Project <br />Project No.: 14-6802; 18-6424: 20.6618 <br />Owner: City of Santa Ana <br />Descrintion of Work: cleaning transitional structure, and remove <br />per RFI 24 <br />transitional <br />Report Na.: <br />.24' -- l <br />PCO#: <br />OT9 2� <br />Revision: <br />3/1412023 <br />Date: <br />3114123 <br />LABOR <br />HOURS <br />HOURLY <br />RATE <br />ADDITIONAL <br />EXTENDED <br />Name & Classification <br />BENEFIT` <br />AMOUNTS <br />Regular7 <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />$119.42 <br />$162.78 <br />Guillermo Saldana (Operator) <br />4.5 <br />0 <br />$119.42 <br />$162.78 <br />$537-39 <br />Ramon Guillen (Foreman Mason) <br />0 <br />0 <br />99.94 <br />$135,07 <br />Salvador Saldana (Labor IV) <br />4.5 <br />-r 0 <br />$92.57 <br />$125,81 <br />$416.57 <br />Ricardo Guillen (Cement Masan) <br />2 <br />: 0 <br />$93.83 <br />$125-90 <br />$187.66 <br />Ramon Guillen Jr. (Mason) <br />0 <br />0 <br />$93.B3 <br />$125.90 <br />$0.00 <br />Cruz Senavente Chan (App) <br />2 <br />. 0 <br />$71.25 <br />$98.67 <br />$142.50 <br />Jesus Gomez (Labor IV) <br />4-5 <br />.a 4 <br />$92-57 <br />$125.81 <br />$416.57 <br />JorgeAlejandres (LaborApp IV) <br />0 <br />0 <br />$71-25 <br />$98-67 <br />$0-00 <br />$0.00 <br />" Explain Additional Benefit: <br />ASUBTOTAL$1.700_BS <br />SUBTOTAL <br />MU 20% <br />34 <br />$0.14 <br />- <br />TOTAL LABOR <br />$2,040-82 <br />EQUIPMENT SBY OPP. SBY OPP. <br />OTHER <br />EXTENDED <br />Description HRS. HRS. COST COST <br />COSTS" <br />AMOUNTS <br />CAT 336EL Excavator 4 $187-52 <br />$750.0$ <br />CAT 345CL Excavator 0 $256.50 <br />$0.00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0.00 <br />CAT 450E Backhoe Loader <br />0 <br />$83.95 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83-95 <br />$0AO <br />CAT 950H Loader <br />0 <br />$136,17 <br />$0-00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38-72 <br />$0-00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />$0.00 <br />Crew Truck 20000 LB <br />4 <br />.-• <br />$37.19 <br />$148.76 <br />Ater Truck 3600 LB <br />D <br />5. 4 <br />CAT 315F <br />0 <br />$61.38 <br />$0-00 <br />Generator <br />0 <br />$7.50 <br />$0.00 <br />" Explain Other Costs: SUBTOTAL <br />$808-84 <br />MU '16% <br />$134.83 <br />_ <br />TOTAL EQUIPMENT <br />$1,033.67 <br />MATERIAL <br />UNIT <br />EXTENDED <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />PRICE <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385-00 <br />$385-00 <br />314" crushed rock <br />c <br />0 <br />45-00 <br />$0.0o <br />CM8 <br />ICY <br />0 <br />25-00 <br />$0.00 <br />SUBTOTAL <br />$385.00 <br />MU 15% <br />$57-75 <br />TOTAL MATERIAL <br />$442-75 <br />OTHER WORK <br />UNIT <br />OTHER <br />EXTENDED <br />UNITS <br />QTY, <br />PRICE <br />COSTS` <br />AMOUNTS <br />Concrete Pump <br />LS <br />0 <br />$0-00 <br />$0.00 <br />Exposed sail <br />Load <br />0 <br />$300.D0 <br />$0.00 <br />" Explain Other Costs. SUBTOTAL <br />$0-00 <br />MU 15% <br />$0.00 <br />TOTAL OTHER WORT[ <br />$0.00 <br />If Above Record is Complete and Correct <br />1� contraatoes Representative <br />Owner S f epresen ttaiive <br />IV 1,AL LR0Vr% yL,V'1V.U4 <br />TOAL EQUIPMENT $1,033.67 <br />TOTAL MATERIAL $442-75 <br />Total fitter $0.00 <br />TOTAL THIS PROPOSAL $3.517.23 <br />