My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: ze� 30 2- <br />Project: Warner Avenue Improvements Project PCO# : E 1-24- 26 <br />Project No.: 14-6802; 18-6424; 2M618 Revision: 3/24/2023 <br />Owner: City of Santa Ana Date: 3/24/23 <br />Description of Work: Removed shoring and dissembling for transport <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL. <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular I <br />OT <br />Regular <br />❑T <br />John Williams (Operator) <br />0 <br />$119.42 <br />$162.78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />5 <br />- 0 <br />$119. 22 <br />$162.78 <br />$597.10 <br />Ramon Guillen (Foreman Mason) <br />0 <br />0 <br />$99.94 <br />$135.07 <br />$0,00 <br />Salvador Saldana (Labor IV) <br />5 <br />0 <br />$92.57 <br />$125,81 <br />$462.85 <br />Ricardo Guillen (Cement Mason) <br />0 <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Ramon Guillen Jr. (Mason) <br />01 <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />0 <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />Jesus Gomez (Labor 1V) <br />5 <br />0 <br />$92.57 <br />$125.81 <br />$462-85 <br />Jorge Alejandres (Labor App IV) <br />0 <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />$0,00 <br />Explain Additional Benefit. <br />SUBTOTAL <br />$1.52_2.80 <br />$304.56 <br />$1,827.36 <br />MU 20% <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />CAT 336EL Excavator <br />5 <br />•• <br />$187.52 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />no <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />CAT 450F Backhoe Loader <br />0 <br />$63.95 <br />CAT 450E Backhoe Loader <br />$83.95 <br />CAT 950H Loader <br />0 <br />$136-17 <br />0.00 <br />GAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT C8248 Roller <br />$38,72 <br />$0.00 <br />Air Compressor 185 w/breaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />$0.00 <br />Crew Truck 20000 LB <br />0 <br />$37,19 <br />0.00 <br />Water Truck 36000B <br />0 <br />45. 4 <br />CAT 315F <br />0 <br />$61-38 <br />$0.00 <br />Generator <br />0 <br />$7.50 <br />$0,00 <br />' Explain Other Cysts: SUBTOTAL <br />MU 16 % <br />TOTAL EQUIPMENT <br />$937_60 <br />$140.64 <br />$1,078.24 <br />MATERIAL <br />Description (A#ach lnvoice} <br />UNITS <br />OTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385.00 <br />3/4" crushed rock <br />c <br />0 <br />45.00 <br />$0.00 <br />CMB <br />CY <br />01 <br />25-00 <br />$0.00 <br />SUBTOTALI <br />MU 15°% <br />TOTAL MATERIAL <br />$385.00 <br />$57.75 <br />$442,75 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />QTY- <br />0 <br />UNIT <br />PRICE <br />$0,00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed trash <br />Load <br />0 <br />$D.00 <br />$0.00 <br />` Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OT14ER WORK <br />$0.00 <br />$0.00 <br />$0-00 <br />If Above Record is Complete and Correct <br />Contractors resersttaative <br />owner's Representative <br />TOTAL LABOR $1,827.36 <br />TOAL EOUIPMENT $1,078-24 <br />TOTAL MATERIAL $442,75 <br />Total fitter $0.00 <br />TOTAL. THIS PROPOSAL $3,348-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.