Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: .� -�,0 <br />Project: Warner Avenue Improvements Project PCO#: 5T� <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 3117/2023 <br />Owner: City of Santa Ana Date: 3117l23 <br />Description of Work: cleaning transitional structure, and Finished concrete corners <br />per RFI 24 (Oak Road transitional structure) - removed trash from the site <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />$119.42 <br />$162.78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />1 <br />0 <br />$119.42 <br />$162.78 <br />$119,42 <br />Raman Guillen (Foreman Masan) <br />0 <br />0 <br />$99.94 <br />$135,07 <br />$0.00 <br />Salvador Saldana (Labor IV) <br />5 <br />e- 0 <br />$92.57 <br />$125.81 <br />$462.85 <br />Ricardo Guillen (Cement Mason) <br />5 <br />0 <br />$93.83 <br />$125.90 <br />$469.15 <br />Ramon Guillen Jr. (Mason) <br />61 <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />0 <br />0 <br />$71-25 <br />$98.67 <br />$0.00 <br />Jesus Gomez (Labor IV) <br />1 <br />0 <br />$92.57 <br />$125.81 <br />$92.57 <br />Jorge Alejandres (Labor App IV) <br />❑ <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />MU -i <br />$1.143.99 <br />$228.80 <br />TOTAL LABOR <br />$1,372,79 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0.00 <br />CAT 415F Skip Loader <br />1 <br />$47.87 <br />$47.87 <br />CAT 450F Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />0 <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT C624B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />_ <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />• <br />$50.64 <br />$10118 <br />Crew Truck 20000 LB <br />4 <br />- <br />$37.19 <br />$146-76 <br />Water Truck 36000 L <br />45. 4 <br />CAT 315F <br />0 <br />$51.38 <br />$0.00 <br />Generator <br />5 <br />:- <br />$7.50 <br />$37.50 <br />- Explain Other Costs. SUBTOTAL <br />MU 15% <br />TOTAL EQUIPMENT <br />$335.41 <br />$50.31 <br />$385.72 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />3B5.00 <br />$385.00 <br />314" crushed rock <br />oy <br />0 <br />45.00 <br />$0.00 <br />CMB <br />CY <br />0 <br />25.00 <br />$0.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$385,00 <br />$57.75 <br />$442.75 <br />OTHER WORT{ <br />Concrete Pump <br />UNITS <br />LS <br />QTY. <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed trush <br />Load <br />1 <br />$620.16 <br />$620.16 <br />" Explain Other Costs SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORT[ <br />$620.16 <br />$93,02 <br />$713.18 <br />If Above Record is ComQlete and C6rrect <br />- Contracto�Re <br />Owners ReprekdntafiVa <br />TOTAL LABOR <br />$1.372.79 <br />TOAL EQUIPMENT <br />$385.72 <br />TOTAL MATERIAL <br />$442.75 <br />Total Otter <br />$713.18 <br />TOTAL THIS PROPOSAL $2,914.44 <br />X? <br />