Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: 31 <br />Project: Warner Avenue Improvements Project PCOM <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 6/29/2023 <br />Owner: City of Santa Ana Date: 6129/23 <br />Description of Work: Additional cost for installation water service 1" on Kitson Dr. <br />City requested h - changes on the drawing <br />Excavated trench and re ared area for p iacin 1" cop Per pipe <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />regular <br />OT <br />John Williams (Operator) <br />0 <br />$1 99-42 <br />$162-78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />7 <br />$119.42 <br />162,78 <br />B35.94 <br />Ramon Guillen (Foreman Mason) <br />f99.94 <br />$135-07 <br />$0. DO <br />Salvador Saldana (Labor IV) <br />0 <br />$92. 77 <br />$125-81 <br />$0,00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />$0.00 <br />Raman Guillen Jr. (Mason) <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />$71-25 <br />$98.67 <br />$0.00 <br />Chris <br />7 <br />$71-25 <br />$9&67 <br />S498.75 <br />Jesus Gomez (Labor IV) <br />0 <br />$92-57 <br />$125.81 <br />$0-00 <br />orge Alejandres [Labor App i, <br />7 <br />$71.25 <br />$498.75 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />$1,833.44 <br />MU 2_0_% <br />$366.69 <br />TOTAL LABOR <br />$2,200.13 <br />EQUIPMENT <br />Description <br />SBY <br />HRS, <br />OPP_ <br />HRS. <br />SBY <br />COST <br />Opp. <br />COST <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187.52 <br />$0-00 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0-00 <br />CAT 415F Skip Loader <br />7 <br />$47.87 <br />$335-09 <br />CAT 45OF Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0A0 <br />CAT 950H Loader <br />0 <br />$136-17 <br />$OA0 <br />CAT 972H Loader <br />$206,74 <br />0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0-00 <br />CAT CB24B Roller <br />$38.72 <br />$0,00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />0.00 <br />Dump Truck 2 axle <br />7 <br />$50A4 <br />354.48 <br />Crew Truck 20000 LB <br />$37-19 <br />0.00 <br />Wafer Truck 3 <br />5.02F <br />$0.00 <br />CAT 315F <br />7 <br />$61.38 <br />$429-66 <br />11100 3iamrnv r $19- <br />Explain Other Costs: <br />- - TOTAL <br />SUBTOTAL <br />Mi115°/a <br />EQUIPMENT <br />S0.00 <br />$1,119.23 <br />$1,287-11 <br />MATER}AL <br />Description (Attach Invoice) <br />UNITS <br />QTY_ <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />90 bend with ball curb and meter connection <br />EA <br />0 <br />154.00 <br />$0,00 <br />Steel Plate 10X6' <br />EA <br />1 6 <br />10.00 <br />$60.00 <br />co per pie 1" LF <br />1 0 15.00 <br />SUBTOTAL <br />_ MU 15 <br />TOTAL MATERIAL <br />$0.00 <br />$6_0.0o <br />$9.00 <br />$69.00 <br />OTHER WORK <br />UNITS <br />QTY. <br />0 <br />UNIT <br />PRICE <br />$0A0 <br />OTHER <br />COSTS" <br />0_DO <br />EXTENDED <br />AMOUNTS <br />0-00 <br />0.00 <br />" Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$0.00 <br />$D.00 <br />$0.00 <br />If Above erord is Complete and Correct <br />cm s Representatve <br />Owners Representative <br />TOTAL LABOR <br />$2,200.13 <br />TOAL EQUIPMENT <br />$1,287-11 <br />TOTAL MATERIAL <br />$69-00 <br />BOND 1% <br />$35.56 <br />TOTAL THIS PROPOSAIL <br />$3,591.8D <br />