Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: L.onerouk, Inc. Report No.: .K 3 <br />Project: Warner Avenue Improvements Project PCOM f 31C <br />Project No.: 14.6802, 18-6424; 20-6618 Revision: 6128/2023 <br />Owner: City of Santa Ana Date_ 6i28123 <br />Description of Work: Additional cost for installation water service I" on Orange Aven. <br />on the drawing <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />T OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />$119,42 <br />$162.78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />6 <br />$119.42 <br />$162.7 <br />$716.52 <br />Ramon Guillen [Foreman Mason) <br />f99. 44 <br />$135-07 <br />$0-00 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />0-65 <br />Ramon Guillen Jr- (Mason) <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />$71-25 <br />$98.67 <br />$0.00 <br />Chris <br />6 <br />$7125 <br />1 $98.67 <br />$427.50 <br />Jesus Gomez (Labor IV) <br />0 <br />$92.57 <br />$125,81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />6 <br />$71.25 <br />$98.67 <br />27-50 <br />$0.00 <br />* Explain Additional Benefit: <br />SUBTOTAL <br />$1,571.62 <br />MU 2 b % <br />$314.30 <br />_ <br />TOTAL LABOR <br />$1,885.82 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPR <br />HRS- <br />SBY <br />COST <br />Opp. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187-52 <br />$0-00 <br />CAT 345CL Excavator <br />0 <br />$256-50 <br />$0.00 <br />CAT 415F Skip Loader <br />6 <br />$47.87 <br />287.22 <br />CAT 45OF Backhoe Loader <br />$83.95 <br />o.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />0 <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />$206,74 <br />0-00 <br />CAT 262D Skid Steer Loader <br />0 <br />$4025 <br />CAT CB24B Roller <br />$38.72 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />$0.00 <br />Crew Truck 20000 LB <br />$37.19 <br />$0.00 <br />Water Truck 3 <br />4 <br />CAT 315E <br />6 <br />$61.38 <br />$368-25 <br />ii 100 ! lammt-r <br />" Explain Other Costs. <br />$19-34 <br />SUBTOTAL <br />MU 15°Io <br />EQUIPMENT <br />$0.00 <br />$655-50 <br />$98.33 <br />$753,83 <br />TOTAL <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />90 bend with ball curb and meter connection <br />EA <br />1 <br />154-00 <br />$154.00 <br />Steel Plate 10X6' 1 <br />1EA <br />6 <br />10.00 <br />$60.00 <br />copper 2ipe 1" LF <br />60 <br />16.00 <br />SUBTOTAL <br />$900.00 <br />$1,114.00 <br />MU 15% <br />$167.10 <br />$1,281.10 <br />TOTAL MATERIAL <br />OTHER WORK <br />UNITS <br />UNIT <br />QTY. PRICE <br />0 $0.00 <br />OTHER <br />COSTS* <br />0.00 <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$o.ao <br />Explain Other Costs: SUBTOTAL <br />MU 166/0 <br />T TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record i; Complete and Correct <br />Contra >'s i2�epr entaiive <br />6 QwnB�s RepfeaCntaG�r <br />TOTAL LABOR $1,885-82 <br />TOAL EQUIPMENT $753.83 <br />TOTALMATERIAL $1,281-10 <br />BOND T% $39.21 <br />TOTAL THIS PROPOSAL $3,959.gq <br />