Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue Improvements Project <br />Project No.: 14-6802; 18-6424; 20-6618 <br />Owner: City of Santa Ana <br />Description of Work: T&M for additional work to construct CB on <br />backfiil RCP by 314" rock <br />Report No.: <br />PCOM <br />Revision: 12/13/2023 <br />Date: 12/13/23 <br />angre Avenue <br />h-] <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT` <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Trenton Hong (operator) <br />8 <br />$71.25 <br />$162-78 <br />$570.00 <br />Guillermo Saldana (Operator) <br />0 <br />$119.42 <br />$162,78 <br />$0.00 <br />Ramon Guiilen {Foreman Mason} <br />8 <br />$99.94 <br />$135,07 <br />$799.52 <br />Ricardo Guiilen {Cement Mason} <br />$93.83 <br />$125.90 <br />$0-00 <br />Ramon Guiilen Jr. (Mason) <br />0 <br />$93.83 <br />$125.90 <br />$0-00 <br />Cruz Benavente Chan (App) <br />8 <br />$71,25 <br />$98.67 <br />$570.00 <br />Manuel <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Chris <br />0 <br />$71,25 1 <br />$98.67 <br />$0-00 <br />$0-00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />MU 20%a <br />TOTAL LABOR <br />$1,939.52 <br />JW7.90 <br />$2,327,42 <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />OPP, <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187-52 <br />$0.00 <br />CAT 345CL Excavator <br />0 <br />$256-50 <br />$0.00 <br />CAT 415E Skip Loader <br />0 <br />$47,87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />5 <br />$136,17 <br />$680.85 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT CB246 Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0-00 <br />Crew Truck 20000 LB <br />4 <br />$37.19 <br />$148,76 <br />ater Truck 36000 LB <br />5.04 <br />CAT 315F <br />5 <br />$61,35 <br />$306-90 <br />Generator 0 <br />Explain Other Costs <br />$19.84 <br />SUBTOTAL <br />mu 160A <br />TOTAL EQUIPMENT <br />$0,00 <br />$1,136,51 <br />$1 70.4s <br />$1,306,99 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />OTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Concrete <br />EA <br />25 <br />6.22 <br />$155-50 <br />Plate and Shoring <br />LS <br />1 <br />500.00 <br />$500,00 <br />314" rock <br />Icy <br />23A0 <br />$115-00 <br />RCP I ILF <br />20 <br />30,00 <br />SUBTOTAL <br />$600,00 <br />$1,370.50 <br />$205.58 <br />$1,576.0$ <br />MU 15% <br />TOTAL MATERIAL <br />OTHER WORK <br />Transport of the soil <br />UNITS <br />Load <br />QTY- <br />1 <br />UNIT OTHER <br />PRICE COSTS" <br />$305-00 <br />EXTENDED <br />AMOUNTS <br />$305.00 <br />$0.00 <br />Expiam Other Casts. SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$306.00 <br />$45.75 <br />$350,75 <br />If Above Record is Complete and Correct <br />Contractors Representative <br />R F -A �'7' <br />Owner's F2aPresentative <br />TOTAL LABOR <br />$2,32I-42 <br />TOAL EQUIPMENT <br />$1,306.99 <br />TOTAL MATERIAL and Other <br />$1,926.83 <br />BOND 1% <br />$55-61 <br />TOTAL THIS PROPOSAL 5.616-85 <br />