Laserfiche WebLink
DAILY EXTRA WORT( REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue Improvements Project <br />Project No.: 14-6802; 18-6424; 20.6618 <br />Owner: City of Santa Ana <br />Description of Work: T&M for additional work to construct CB on <br />Rexcavated trench and removed existing RI <br />Report No.: 3 <br />PCO#: <br />Revision: 1211 12023 <br />Date: 12/12/23 <br />ange Avenue <br />excavated trench between <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular I <br />OT <br />Regular <br />OT <br />Trenton Hong {operator} <br />61, <br />$71-25 <br />$162.78 <br />27-50 <br />Guillermo Saldana (Operator) <br />0 <br />$119.42 <br />$162.78 <br />$0.00 <br />Ramon Guillen (Foreman Mason) <br />2 <br />$99.94 <br />$135.07 <br />$199.88 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$125,81 <br />$0-00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />$0-00 <br />Ramon Guillen Jr. (Mason) <br />0 <br />$93-83 <br />$125-90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />2 <br />$71.25 <br />$98.67 <br />$142.50 <br />Peter Arroyo (App) <br />$71.25 <br />$98.67 <br />$0.00 <br />Manuel <br />6 <br />$92.57 <br />$125-81 <br />$555A2 <br />Chris <br />6 <br />$71.25 <br />$98.67 <br />427-50 <br />$0-00 <br />' Explain Additional Benefit' <br />SUBTOTAL <br />$1,752_80 <br />$350,56 <br />$2,103.36 <br />MU_2M <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />❑PP- I <br />HRS- <br />SBY <br />COST <br />Opp. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0-00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0-00 <br />CAT 45OF Backhoe Loader <br />1 <br />$83.95 <br />$0-00 <br />CAT 454E Backhoe Loader <br />$83-95 <br />$0-00 <br />CAT 950H Loader <br />3 <br />$13E.17 <br />$408.51 <br />CAT 972H Loader <br />$206-74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />$40-25 <br />$0.00 <br />CAT CB24B Roller <br />$38-72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />2 <br />$37.19 <br />$74.38 <br />Water Truck 36000 LB <br />$45.04 <br />CAT 315E <br />1 3 <br />$61.38 <br />$184.14 <br />Generator a <br />Explain Other Costs: <br />$19. a4 <br />SUBTOTAL <br />MU 15% <br />EQUIPMENT <br />$0-00 <br />$667-03 <br />$100.05 <br />$767.08 <br />TOTAL <br />MATERIAL <br />Description {Attach invoice} <br />UNITS QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Disposal of the wood from the ttrees <br />EA 1 <br />100.00 <br />$100-00 <br />30.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$0-00 <br />$100,00 <br />$15.00 <br />$115.00 <br />OTHER WORK <br />Transport of the soil <br />UNITS <br />Load <br />QTY, <br />UNIT <br />PRICE <br />$305-00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$0-00 <br />" Explain Other Costs: SUBTOTAL <br />MU i s% <br />TOTAL? RWORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct <br />Contractors Representative <br />.r J J <br />0 is Representative <br />TOTAL- LABOR $2,103-36 <br />TOAL EQUIPMENT $767.08 <br />TOTAL MATERIAL and Other $115.00 <br />BOND 1% $29.85 <br />TOTAL THIS PROPOSAL 3,015-30 <br />