Laserfiche WebLink
DAILY EXTRA WORD[ REPORT <br />Contractor: Lonerock, Inc. Report No.: <br />Project: Warner Avenue Improvements Project PCO#: <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 111012 23 <br />Owner: City of Santa Ana Hate: 1110123 <br />Description of Work: T&M for additional work for sewer line repair to Weis Fargo Bank <br />Sawcut bike line concrete, demo concrete and removed CMB, open pipe <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDER <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Trenton Hong (operator) <br />0 <br />$71.25 <br />$162.75 <br />$0.00 <br />Guillermo Saldana (Operator) <br />6 <br />$119.42 <br />$162.78 <br />$716-52 <br />Ramon Guillen (Foreman Mason) <br />0 <br />$99.94 <br />$135,07 <br />$0.00 <br />Salvador Saldana (Labor 5 ) <br />Ricardo Guillen (Cement Mason) <br />0 <br />$92-57 <br />$93-83 <br />$125,81 <br />$125-90 <br />$0.00 <br />0-00 <br />Ramon Guillen Jr. (Mason) <br />0 <br />$93-83 <br />$125.90 <br />$0-00 <br />Cruz 8enavente Chan (App) <br />Peter Arroyo (App) <br />0 <br />$71.25 <br />$71.25 1 <br />$98-67 <br />$98.67 <br />$o.00 <br />$0,00 <br />Manuel <br />Chris <br />0 <br />6 <br />r <br />$92-57 <br />$71.25 <br />$125-81 <br />$98.67 <br />$0.00 <br />$427.50 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTALI <br />MU 20% <br />TOTAL LABOR <br />$1,144,02 <br />$228-80 <br />$1,372.82 <br />EQUIPMENT <br />Description <br />CAT 336EL Excavator <br />CAT 345CL Excavator <br />SBY <br />HRS. <br />Opp. <br />HRS. <br />0 <br />SBY <br />COST <br />OPP. <br />COST <br />$187.52 <br />$256.50 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$0-00 <br />CAT 415F Skip Loader <br />0 <br />$47-87 <br />$0-00 <br />CAT 45OF Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />CAT 950H Loader <br />CAT 972H Loader <br />0 <br />$83-95 <br />$136.17 <br />$206.74 <br />$0.00 <br />$0.00 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />6 <br />$40.25 <br />$241.50 <br />CAT CB24B Roller <br />$3B.72 <br />$0-00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />$0.00 <br />Crew Truck 20000 LB <br />0 <br />$37.19 <br />$0.00 <br />Ater Truck B <br />45. 4 <br />CAT 315F <br />8 <br />- <br />$61.38 <br />$491-04 <br />Breaker 3 - <br />' Explain Other Costs: <br />$55.00 <br />SUBTOTAL <br />MlJ 15°/1 <br />TOTAL EQUIPMENT <br />$165,00 <br />$897.54 <br />$134.63 <br />$1,032.17 <br />MATERIAL <br />Description (Attach Invoice) <br />i <br />UNITS CITY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Traffic Control <br />h 0 <br />68.75 <br />$0.00 <br />30.00 <br />SUBTOTAL <br />MU 16%. <br />TOTAL MATERIAL <br />$0.00 <br />$0-00 <br />$0.00 <br />$0-00 <br />OTHER WORK <br />Transport of the soil <br />UNITS <br />Load <br />QTY. <br />UNIT <br />PRICE <br />$305,00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$0.00 <br />' Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />R [ �7n on <br />If Abov Rec rd is Complete and Correct <br />Contra is epresentative <br />/ I f IZlIZ4 <br />oYer's 'epresentative <br />IV 1 HL L MiD UM .p 1,. I c-uc <br />TOAL EQUIPMENT $1,032.17 <br />TOTAL MATERIAL and Other $0.00 <br />BOND 1% $24-05 <br />TOTAL THIS PROPOSAL $2,429.04 <br />