Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: ¢ <br />Project: Warner Avenue Improvements Project PCC#: C�f <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 1/12/2023 <br />Owner: City of Santa Ana Date: 1 /12/23 <br />Description of Work: T&M for additional work for sewer line repair to Weis Fargo Bank <br />5awcut bike line concrete, demo concrete and removed CMB, open pipe <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />Trenton Hong (operator) <br />0 <br />$71.25 <br />$162.78 <br />$0-00 <br />Guillermo Saldana (Operator) <br />0 <br />$119.42 <br />$162,78 <br />$0.00 <br />Ramon Guillen (Foreman Mason) <br />1 <br />$99.94 <br />$135.07 <br />$99.94 <br />Salvador 5aldana (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />0.00 <br />Ricardo Guillen (Cement Mason) <br />$93-83 <br />$125.90 <br />$0.00 <br />Raman Guillen Jr- (Mason) <br />0 <br />$93-83 <br />$125.90 <br />$0.00 <br />Cruz Benavente Chan (App) <br />2 <br />$71.25 <br />$98-67 <br />$142-50 <br />Peter Arroyo (App) <br />$71.25 1 <br />$98.67 <br />$0-00 <br />Manuel <br />0 <br />$92.57 <br />$125-81 <br />$0.00 <br />Chris <br />$71.25 <br />$98.67 <br />$427.50 <br />$0.00 <br />" Explain Additional Benefit <br />-- <br />SUBTOTAL <br />MU 20% <br />TOTAL LABOR <br />$6.69-94 <br />$133-99 <br />$80393 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS- <br />SBY <br />COST <br />OPP- <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 3450L Excavator <br />0 <br />$256-50 <br />$0.00 <br />CAT 415F Skip Loader <br />0 <br />$47-87 <br />$0.00 <br />CAT 450F Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />0 <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />$206.74 <br />$0-00 <br />CAT 262D Skid Steer Loader <br />2 <br />$40.25 <br />$80-50 <br />CAT C824B Roller <br />1 <br />$38-72 <br />$0-00 <br />Air Compressor 185 wlbreaker <br />$36-28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />0 <br />$37-19 <br />$0.00 <br />Water Truck 35000B <br />4 <br />CAT 315F <br />0 <br />$61-38 <br />$0.00 <br />BreaKer 0 <br />' Explain Other Costs: <br />- <br />$55-00 <br />SUBTOTAL <br />MU 15% <br />EQUIPMENT <br />$0.00 <br />$80-50 <br />$12-08 <br />$92.58 <br />TOTAL <br />MATERIAL <br />Description (Attach Invoice) <br />i <br />UNITS QTY- <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Traffic Control <br />h 0 <br />68.75 <br />$0.00 <br />CMS cy 1 30.00 <br />SUBTOTAL <br />_ MU 15°% <br />TOTAL MATERIAL <br />$30.00 <br />$30.00 <br />$4.50 <br />$34-50 <br />OTHER WORK <br />Transport of the soil <br />UNITS <br />Load <br />CITY. <br />UNIT <br />PRICE <br />$305-00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />0.00 <br />" Explain Other Costs: _SUBTOTAL <br />MU 15°% <br />TOTAL OTHER Wck <br />$0-00 <br />$0.00 <br />$0-00 <br />If Above Record is Complete and Correct <br />cfer s R presen[Ative ' <br />1 own rs epre6e ab e <br />t GIAL U-10 rc .ZPOVJ-yam <br />TOAL EQUIPMENT $92.58 <br />TOTAL MATERIAL and Other $34.50 <br />BOND 1% $9.31 <br />TOTAL THIS PROPOSAL $940.31 <br />