Laserfiche WebLink
CITY OF SANTA ANA <br /> DG walkways and trails require additional attention to be properly maintained. <br /> The two (2) most common conditions are an uneven surface and lack of moisture. <br /> Both issues can make the material unstable and sand-like, creating an unsafe <br /> surface. <br /> a. The integrity of the surface must be kept intact at all times. <br /> b. The contractor shall perform daily inspections of DG surfaces. <br /> c. Borders of DG areas shall be kept in proper repair and well-defined at <br /> all times. <br /> d. DG areas shall be kept free of weeds at all times. <br /> e. Monthly maintenance of DG areas shall be according to industry <br /> standards. <br /> f. Contractor shall immediately repair any DG areas where holes or <br /> ruts are apparent, or where the surface becomes uneven. <br /> g. Materials will be supplied by the City to maintain the integrity of the <br /> product. <br /> 5. Parking Lots, Bike Trails, and Roads <br /> These areas include parking lots and roads located within the boundaries of the <br /> parks, or areas directly adjacent to parks, and whose primary purpose is to provide <br /> vehicle parking for patrons. Street parking areas that are not meant specifically <br /> for park users will not be included in this section. Areas in doubt should be clarified <br /> with the CR. <br /> a. All areas shall be inspected daily and maintained in a neat, clean, <br /> and safe condition at all times. Any hazards shall be reported <br /> immediately to the CR. <br /> b. All areas shall be swept, blown, and/or vacuumed weekly to remove <br /> all debris and deposits of silt and/or sand and glass. <br /> c. Cracks and crevices shall be kept free of weeds at all times. <br /> d. Illegally dumped foreign substances, such as motor oil, shall be <br /> properly cleaned immediately. <br /> RFP 23-151 Landscape Maintenance Services Page 27 of 135 <br />