My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Clerk
>
Contracts / Agreements
>
P
>
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 5:17:54 PM
Creation date
5/17/2024 10:36:18 AM
Metadata
Fields
Template:
Contracts
Company Name
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Contract #
A-2024-007-04
Agency
Public Works
Council Approval Date
1/16/2024
Expiration Date
1/31/2027
Insurance Exp Date
5/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"1 CITY OF SANTA ANA <br /> SECTION II <br /> IRRIGATION <br /> The irrigation system consists of all components from the outflow side of the meter. The Contractor shall <br /> control the irrigation programming components with the coordination of the CR, while the CR will control <br /> those components operated by the central programming software Calsense. All manual control systems <br /> shall be directly overseen weekly, and in a manner, which allows the irrigation specification to be <br /> completed. Contractor shall employ a certified irrigation specialist per district, Zoo, and Civic Center. <br /> A. General Information <br /> Water management within the City landscape maintenance areas is guided by the following <br /> parameters: <br /> 1. Application of water to landscape plants at a rate closely matching the demands of plant <br /> material; <br /> 2. Minimizing runoff; <br /> 3. Water conservation and plant health are given equal consideration; <br /> 4. Roadway condition and safety; <br /> 5. Safe surfaces for community use; <br /> 6. Water budget; and <br /> 7. Plant health. <br /> B. Water Management <br /> Water conservation is a top priority for the City and shall be incorporated into all irrigation <br /> programming. The irrigation schedule is dynamic and regularly needs to be altered to meet the <br /> needs of the City landscape. CR shall determine the schedule and Contractor shall program the <br /> controllers to meet this schedule. Landscape irrigation is currently being switched to Calsense <br /> Central Control. It is intended that the City will perform water management responsibilities within <br /> the central control system. <br /> 1. City of Santa Ana irrigation system includes: <br /> a. Battery controllers (Hunter Nodes) in valve boxes <br /> b. Non-centrally controlled manual clocks <br /> c. Hydraulic valves <br /> d. Thermal valves <br /> e. Quick coupler systems <br /> f. Electric valves <br /> g. Solar-powered controllers (Leit) <br /> RFP 23-151 Landscape Maintenance Services Page 28 of 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.