Laserfiche WebLink
concepts; CITY OF SANTA ANA <br /> 3. Capable of performing irrigation audits and providing a report; <br /> 4. Capable of taking direction from several City personnel, but particularly accountable to <br /> the City Irrigation Technician and the area gardener; and <br /> 5. Capable of verbal and written communication in a professional level of English. <br /> F. Materials <br /> The City shall supply irrigaton materials and supplies. However, there will be occasions when a repair <br /> is necessary and the City is out of inventory. In these cases, Contractor shall be required to supply the <br /> materials. Contractor is responsible for repairs, including but not limited to, irrigation rotors/heads, <br /> lateral lines, and parts from the downstream side of the irrigation systems' remote-control valves <br /> (RCVs) at no extra cost to the City. <br /> 1. City reserves the right to purchase materials directly and make them available to the <br /> Contractor. In the event the City exercises this option, the following conditions will <br /> apply: <br /> a. All City purchases will be for the sole use of and for the City. <br /> b. Contractor shall secure and store inventory, distribute and control all material <br /> entrusted to its representatives. All materials and inventories shall be made <br /> available to the City upon request. <br /> c. All material given to the Contractor shall be inventoried by location using the <br /> electronic work order system. The replaced part shall be returned to the City <br /> to remove the replacement part from the outstanding inventory. <br /> 2. All replacement materials shall be original types and models unless a CR approves a <br /> substitute. <br /> 3. Contractor shall maintain, at no additional cost to the City, an adequate inventory of <br /> medium- to high-usage stock items to repair the irrigation systems. <br /> 4. Contractor shall implement repairs under all warranties. <br /> 5. All invoices, AEW, shall state labor and material costs. <br /> 6. The actual cost of all materials passed onto the City shall include the following: <br /> a. Wholesale cost (retail costs minus Contractor's discount) <br /> b. Applicable sales tax <br /> c. A markup of 10% maximum for all overhead costs and profits <br /> 7. The wholesale cost shall be the actual cost paid by Contractor reflecting the <br /> best price, including any discount given to Contractor (written receipt submitted with <br /> billing) <br /> 8. At no time shall the cost of materials exceed the retail cost from the current price list, <br /> minus any discounts. <br /> RFP 23-151 Landscape Maintenance Services Page 33 of 135 <br />