My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Clerk
>
Contracts / Agreements
>
P
>
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 5:17:54 PM
Creation date
5/17/2024 10:36:18 AM
Metadata
Fields
Template:
Contracts
Company Name
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Contract #
A-2024-007-04
Agency
Public Works
Council Approval Date
1/16/2024
Expiration Date
1/31/2027
Insurance Exp Date
5/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Inspection of Perimeter Fence—Daily, the Contractor shall inspect the integrity of the <br /> chain link perimeter fence for breaches and advise the Zoo Director or CR of issues. <br /> 20. Trimming and Weed Removal within Exhibits— <br /> a. Quarterly, the Contractor shall blow-off leaf litter accumulating on animal <br /> exhibit roofs, netting, cages, etc. including, but not limited to, Colors of the <br /> Amazon Bird Aviary. <br /> b. Monthly, the Contractor shall inspect plant material in the animal exhibits for <br /> damage to the netting and trim plants pushing through animal exhibit roofs, <br /> netting, cages, etc. to prevent damage. <br /> c. Contractor shall perform weed removal in the Anteater and Amazon's Edge <br /> exhibits. <br /> 21. Pressure Washing - The Contractor shall perform weekly and as necessary pressure <br /> washing of paved areas, site furniture, drinking fountains, etc. in the cafe eating area. <br /> 22. Resetting Seating —The Contractor shall, Monday through Sunday, before 10:00 am <br /> each morning, reset all tables and chairs in the Zoo. <br /> 23. Blowing-Off Exhibits — The Contractor shall blow-off/clean animal exhibit roofs, <br /> netting, cages, etc. on a routine basis. Prior to performance, the Contractor shall <br /> coordinate with the CR. <br /> 24. Storm Drain Maintenance — The Contractor shall continuously maintain the Zoo's <br /> storm/area drains, including the filter fiber by keeping them clean and free of debris. <br /> The Contractor shall change the storm/area drains filter fiber, which shall be provided <br /> by the Zoo, as necessary. <br /> 25. Weekly Meeting —The contractor shall plan to have a standing weekly meeting with <br /> the CR and involve the IPM representative in the meeting. <br /> 26. All IPM and Agricultural pest control services at the Zoo only shall be performed <br /> under a separate agreement by a state licensed/certified agricultural pest control <br /> QAL licensed company. <br /> RFP 23-151 Landscape Maintenance Services Page 75 of 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.