Laserfiche WebLink
times. <br /> 3.14.2.1 Contractor shall respond by phone within 30 minutes of a call from the <br /> CR(s), and shall be on site within 30 minutes of the call back. Any changes <br /> to contact information shall be forwarded to the City in writing within 12 <br /> hours of any such change. <br /> 3.14.2.2 In situations involving emergencies after normal work hours, Contractor <br /> shall dispatch qualified personnel and equipment to reach the site within <br /> one (1) hour. <br /> 3.14.2.3 Calls of an emergency nature received by the City shall be referred to <br /> Contractor for immediate disposition. <br /> 3.14.3 If emergency work is required, the Contractor shall notify the CR(s) by telephone before <br /> any emergency work is commenced. <br /> 3.14.4 Contractor's vehicle shall carry sufficient equipment to control traffic (barricades, <br /> delineators, cones, etc.). <br /> 3.14.5 When the Contractor arrives at the site, Contractor shall set up traffic warning and control <br /> devices and any other safety devices, if deemed necessary, and proceed with remedial <br /> action after contacting the CR(s). <br /> 3.14.7 Public health/safety matters requiring an emergency response include but are not limited to: any portion of <br /> the irrigation system functioning in a non-operational manner, broken water mains, stuck valves,the <br /> threat to private property resulting from Contractor's operations, fallen trees, down or hanging limbs, <br /> natural disasters, etc. <br /> 3.15 Contractor's Staff <br /> The contractor shall provide sufficient personnel to perform all work by the Specifications set forth herein and in <br /> Appendix A, B, C, and D. This is a performance-based Contract. <br /> 3.15.1 In its proposal, the Contractor shall define the minimum staffing. It is up to the Contractor <br /> to complete all tasks as defined, regardless of staffing, but they shall maintain at least the <br /> minimum staffing, as stated in their proposal, at all times. <br /> 3.15.2 In its proposal, the Contractor shall list the names of all employees, titles, hours and which <br /> location/area each employee is assigned. DIR reporting sheets will be used to verify <br /> staffing levels by area. <br /> 3.15.2.1 Each crew of Contractor's employees shall include at least one (1) individual <br /> who speaks and comprehends the English language at a professional level. <br /> 3.15.3 The City may, at any time, give Contractor notice to the effect that the conduct or action <br /> of a designated employee of Contractor is, in the reasonable belief of the City, detrimental <br /> to the interest of the City or public. Contractor shall meet with representatives of the City <br /> to consider the appropriate course of action with respect to such matter, and Contractor <br /> shall take reasonable measures under the circumstances to assure the City that the <br /> conduct and activities of Contractor's employee(s)will not be detrimental to the interest of <br /> the City or public. Examples of employee conduct or action that prove detrimental to the <br /> interest of the City of public include, but are not limited to: <br />