My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Clerk
>
Contracts / Agreements
>
P
>
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 5:17:54 PM
Creation date
5/17/2024 10:36:18 AM
Metadata
Fields
Template:
Contracts
Company Name
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Contract #
A-2024-007-04
Agency
Public Works
Council Approval Date
1/16/2024
Expiration Date
1/31/2027
Insurance Exp Date
5/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to use due care shall be corrected or paid for by Contractor at no additional cost to the <br /> City. <br /> 3.12.2 If the City requests or directs Contractor to perform work in a given area, Contractor shall <br /> verify and locate any underground utilities. This does not release Contractor's duty to <br /> take reasonable precautions when working in these areas. Any damage or problems shall <br /> be reported immediately to the City. <br /> 3.13 Protection of Property During Inclement Weather (Emergency Response) <br /> During storms and periods of excessive rainfall, and in conjunction with Emergency Call-Outs (below), Contractor <br /> shall provide supervisory inspection of the work during regular working hours to prevent or minimize possible <br /> damage from such adverse weather. The prime factors in assigning work shall be the safety of the workforce and <br /> damage to landscaping. <br /> 3.13.1 Contractor shall submit a report identifying any storm damage to the CR(s) and attach a <br /> site map identifying location of damage and cost estimate to repair/replace within 48 <br /> hours. <br /> 3.13.1.1 Report shall contain photos with captions. <br /> 3.13.1.2 If remedial work is required beyond the scope of this Contract, it shall be <br /> paid for as AEW. <br /> 3.13.2 Contractor shall remove debris accumulated by high winds or other typical or non-typical <br /> environmental conditions. The contractor shall remove minor silt and debris from athletic <br /> fields, V- ditches, adjacent inverts, storm drains, etc. <br /> 3.13.3 During the periods that excessive rainfall hinders normal operations, the Contractor shall <br /> adjust its activities to perform functions such as litter and debris pick-up, remove downed <br /> limbs, clear drains and other duties as deemed necessary by the CR(s). <br /> 3.13.3.1 During periods of excessive rainfall, the Contractor shall keep all area drains <br /> and draining facilities clear and operating and remove water from all tot- lot <br /> areas, if directed. <br /> 3.13.4 Failure to adjust the workforce to show satisfactory progress, as determined by Contractor <br /> and CR(s) jointly, on the work may result in a deduction of payments. <br /> 3.14 Emergency Numbers and Emergency Call-Outs <br /> 3.14.1 Contractor shall supply the City with name(s) and phone number(s) of person(s) <br /> representing the Contractor for 24-hour emergency response, seven (7) days per week. <br /> 3.14.1.1 The City will, in turn, provide Contractor its emergency contact information <br /> so that in the event Contractor must contact the CR(s), this information can <br /> be utilized. <br /> 3.14.2 Contractor shall have the capability to receive and to immediately respond to calls of an <br /> emergency nature during normal working hours and during hours outside of normal <br /> working hours (See Section 2.3.1.k). Contractor shall be available via voicemail, text, <br /> phone, or answering service. The aforementioned information shall remain current at all <br />
The URL can be used to link to this page
Your browser does not support the video tag.