Laserfiche WebLink
120 <br />11. Harbor Boulevard and 1st Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Harbor Boulevard and 1st Street is a busy intersection in the upper <br />west quarter of the City with commercial retail at all corners. Six <br />vehicle lanes, not counting multiple turn lanes in each direction, <br />are on each leg of the intersection. The significantly high traffic <br />volume at this intersection results in a similarly high collision rate <br />during the study period, with multiple severe injuries and one <br />fatality two blocks east of this intersection where a raised median <br />is not provided. Sidewalks, curb ramps, and bus stops are provided <br />on both sides of the street. Bicycle facilities are provided going <br />westbound on 1st Street and southbound on Harbor Boulevard. High <br />visibility crosswalks are missing. Figure 6-12 shows recommended <br />improvements that could be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />0 0.5 10.25 Miles <br />Serious Injuries and Fatalities between 2017-2021 <br />1 <br />Pedestrian <br />1 3 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))**** <br />11,,553322,,331100$$ 11,,886644,,228899$$ <br />4400,,000000$$ 4488,,666666$$ <br />11,,557733,,000000$$ 11,,991133,,000000$$ <br />220000,,000000$$ 225500,,000000$$ <br />228800,,000000$$ 335500,,000000$$ <br />4400,,000000$$ 5500,,000000$$ CM330000,,000000$$ 337700,,000000$$ <br />882200,,000000$$ 11,,002200,,000000$$ <br />22,,440000,,000000$$ 22,,994400,,000000$$ <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SS aannttaa AAnnaa VViissiioonn ZZeerroo <br />HHaarrbboorr BBllvvdd//11sstt SStt <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT <br />Santa Ana Vision Zero Summary <br />  <br />  <br />City Council 32 – 125 6/4/2024