|
120
<br />11. Harbor Boulevard and 1st Street
<br />Intersection Project
<br />Existing Conditions and Recommendations
<br />Harbor Boulevard and 1st Street is a busy intersection in the upper
<br />west quarter of the City with commercial retail at all corners. Six
<br />vehicle lanes, not counting multiple turn lanes in each direction,
<br />are on each leg of the intersection. The significantly high traffic
<br />volume at this intersection results in a similarly high collision rate
<br />during the study period, with multiple severe injuries and one
<br />fatality two blocks east of this intersection where a raised median
<br />is not provided. Sidewalks, curb ramps, and bus stops are provided
<br />on both sides of the street. Bicycle facilities are provided going
<br />westbound on 1st Street and southbound on Harbor Boulevard. High
<br />visibility crosswalks are missing. Figure 6-12 shows recommended
<br />improvements that could be extended farther along the route.
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />Project Location
<br />0 0.5 10.25 Miles
<br />Serious Injuries and Fatalities between 2017-2021
<br />1
<br />Pedestrian
<br />1 3
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />11,,553322,,331100$$ 11,,886644,,228899$$
<br />4400,,000000$$ 4488,,666666$$
<br />11,,557733,,000000$$ 11,,991133,,000000$$
<br />220000,,000000$$ 225500,,000000$$
<br />228800,,000000$$ 335500,,000000$$
<br />4400,,000000$$ 5500,,000000$$ CM330000,,000000$$ 337700,,000000$$
<br />882200,,000000$$ 11,,002200,,000000$$
<br />22,,440000,,000000$$ 22,,994400,,000000$$
<br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SS aannttaa AAnnaa VViissiioonn ZZeerroo
<br />HHaarrbboorr BBllvvdd//11sstt SStt
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT
<br />Santa Ana Vision Zero Summary
<br />
<br />
<br />City Council 32 – 125 6/4/2024
|