My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Agenda Packet_2024-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2024 5:56:40 PM
Creation date
5/29/2024 5:41:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA VISION ZERO PLAN <br />RECOMMENDED ENGINEERING IMPROVEMENTS <br />121Harbor Blvd1st St Add hardened centerline <br />in front of median <br />Add curb refuge islands with <br />truck aprons at corners or curb <br />extensions with directional <br />wheelchair ramps <br />Add crossbikes <br />Add yellow reflective border on signal <br />heads on all four approaches <br />Include bicycle/pedestrian <br />friendly signal timing, such <br />as LPIs, if possible. <br />Add bike-friendly bus stop <br />based on roadway and <br />bikeway configurations. <br />See section 6.1.9 for <br />available typologies. <br />Add high visibility continental <br />crosswalks with stop bar 5 ft <br />behind crosswalk <br />Add raised Type C curb <br />on yellow divider line <br />Add separated bikeway <br />Add separated bikeway <br />KTU+A <br />3916 Normal St <br />San Diego, CA 92103 Santa Ana Vision Zero Plan <br />Conceptual Site Plan Scale: 1" = 40'-0" <br />January 2024 <br />1st St and Harbor Blvd <br />Multi-use Path <br />Bike Lane MarkingBike Crossing <br />MarkingsHigh Visibility <br />Crosswalk Lane divider and/or <br />c-curb divider <br />Road StripingHigh Visibility School <br />Crosswalk Bike Sharrow Marking <br />DISCLAIMER NOTE: All <br />improvements shown in <br />concept plans are subject <br />to further evaluation. <br />Note: All driveways with bike lanes or separated bike lanes to receive driveway treatments in <br />the form of 'continuous sidewalks' or rubber humps. See details page for more information.Figure 6-12: Harbor Boulevard and 1st Street Recommendations <br />Note: All driveways with bike lanes or separated <br />bikeways to receive driveway treatments in the form <br />of ‘continuous sidewalks’ or rubber humps. See <br />details page for more information. <br /> <br />City Council 32 – 126 6/4/2024
The URL can be used to link to this page
Your browser does not support the video tag.