|
124
<br />13. Harbor Boulevard and McFadden Avenue
<br />Intersection Project
<br />Existing Conditions and Recommendations
<br />Harbor Boulevard and McFadden Avenue is another busy intersection
<br />in the upper east quarter of the City with commercial retail at all
<br />corners. Not counting multiple turn lanes, there are six north-south
<br />vehicle lanes, and four west-east through lanes. Significantly high
<br />traffic volumes and collision rates have resulted in two fatalities
<br />and one severe injury during the study period. Raised medians are
<br />provided on three legs of the intersection. Sidewalks, curb ramps,
<br />and bus stops are provided on both sides of the street. Bicycle
<br />facilities are provided on three legs of the intersection but the east
<br />leg of McFadden Avenue has no bike facilities. Figure 6-14 shows
<br />recommended improvements that could be extended farther along
<br />the route.
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />Project Location
<br />00.510.25Miles
<br />Serious Injuries and Fatalities between 2017-2021
<br />2
<br />Pedestrian
<br />0 3
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />11,,556677,,448855$$ 11,,990077,,008855$$
<br />4400,,000000$$ 4488,,666666$$
<br />11,,660088,,000000$$ 11,,995566,,000000$$
<br />221100,,000000$$ 226600,,000000$$
<br />229900,,000000$$ 336600,,000000$$
<br />4400,,000000$$ 5500,,000000$$ CM331100,,000000$$ 338800,,000000$$
<br />885500,,000000$$ 11,,005500,,000000$$
<br />22,,446600,,000000$$ 33,,001100,,000000$$
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT DESIGNTTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SS aannttaa AAnnaa VViissiioonn ZZeerroo
<br />HHaarrbboo rr BBllvv dd//MMccFF aaddddeenn AAvv ee
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))
<br />Santa Ana Vision Zero Summary
<br />
<br />
<br />City Council 32 – 129 6/4/2024
|