126
<br />14. 1st Street and Flower Street
<br />Intersection Project
<br />Existing Conditions and Recommendations
<br />1st Street and Flower Street is a busy intersection near the center
<br />of the City at the southwest corner of downtown Santa Ana.
<br />Tennis courts that are part of the Santa Ana High School are at the
<br />southeast corner of the intersection. Multifamily and commercial retail
<br />occupy the other three corners. There are a total of six westbound
<br />and eastbound vehicle lanes, not counting multiple turn lanes.
<br />Northbound and southbound lanes total four plus dedicated turn
<br />lanes. High traffic volumes and collision rates have resulted in two
<br />severe injuries during the study period. Raised medians are provided
<br />on three legs of the intersection. Sidewalks, curb ramps, and bus
<br />stops are provided on both sides of the street. Bicycle facilities are
<br />provided on all legs of the intersection class II bike lane markings
<br />without buffers. Figure 6-15 shows recommended improvements that
<br />could be extended farther along the route.
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />Project Location
<br />0 0.5 10.25 Miles
<br />Serious Injuries and Fatalities between 2017-2021
<br />0
<br />Pedestrian
<br />0 0
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />11,,223399,,116655$$ 11,,555566,,330000$$
<br />4400,,000000$$ 4488,,666666$$
<br />11,,228800,,000000$$ 11,,660055,,000000$$
<br />116600,,000000$$ 220000,,000000$$
<br />223300,,000000$$ 228800,,000000$$
<br />3300,,000000$$ 4400,,000000$$ CM225500,,000000$$ 331100,,000000$$
<br />667700,,000000$$ 883300,,000000$$
<br />11,,995500,,000000$$ 22,,444400,,000000$$
<br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SSaannttaa AAnnaa VViiss iioo nn ZZeerroo
<br />11sstt SStt aanndd FFlloowweerr SStt IInntteerrsseeccttiioonn
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT DESIGNSanta Ana Vision Zero Summary
<br />
<br />
<br />City Council 32 – 131 6/4/2024
|