Laserfiche WebLink
126 <br />14. 1st Street and Flower Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />1st Street and Flower Street is a busy intersection near the center <br />of the City at the southwest corner of downtown Santa Ana. <br />Tennis courts that are part of the Santa Ana High School are at the <br />southeast corner of the intersection. Multifamily and commercial retail <br />occupy the other three corners. There are a total of six westbound <br />and eastbound vehicle lanes, not counting multiple turn lanes. <br />Northbound and southbound lanes total four plus dedicated turn <br />lanes. High traffic volumes and collision rates have resulted in two <br />severe injuries during the study period. Raised medians are provided <br />on three legs of the intersection. Sidewalks, curb ramps, and bus <br />stops are provided on both sides of the street. Bicycle facilities are <br />provided on all legs of the intersection class II bike lane markings <br />without buffers. Figure 6-15 shows recommended improvements that <br />could be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />0 0.5 10.25 Miles <br />Serious Injuries and Fatalities between 2017-2021 <br />0 <br />Pedestrian <br />0 0 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))**** <br />11,,223399,,116655$$ 11,,555566,,330000$$ <br />4400,,000000$$ 4488,,666666$$ <br />11,,228800,,000000$$ 11,,660055,,000000$$ <br />116600,,000000$$ 220000,,000000$$ <br />223300,,000000$$ 228800,,000000$$ <br />3300,,000000$$ 4400,,000000$$ CM225500,,000000$$ 331100,,000000$$ <br />667700,,000000$$ 883300,,000000$$ <br />11,,995500,,000000$$ 22,,444400,,000000$$ <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SSaannttaa AAnnaa VViiss iioo nn ZZeerroo <br />11sstt SStt aanndd FFlloowweerr SStt IInntteerrsseeccttiioonn <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%)) <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT DESIGNSanta Ana Vision Zero Summary <br />  <br />  <br />City Council 32 – 131 6/4/2024