Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />RECOMMENDED ENGINEERING IMPROVEMENTS <br />129 <br />Edinger Ave <br />Maple St4.0 <br />Add bike-friendly bus stop <br />based on roadway and <br />bikeway configurations. See <br />Section 6.1.9 for available <br />typologies. <br />Add high visibility <br />continental crosswalks <br />with stop bars <br />Add yellow reflective border on <br />signal heads on both approaches <br />Add curb extension <br />with directional <br />wheelchair ramps <br />Maple StAdd truck aprons with <br />directional wheelchair ramps <br />Add <br />crossbikes <br />KTU+A <br />3916 Normal St <br />San Diego, CA 92103 Santa Ana Vision Zero Plan <br />Conceptual Site Plan Scale: 1" = 40'-0" <br />January 2024 <br />Edinger Ave and Maple St <br />Multi-use Path <br />Bike Lane MarkingBike Crossing <br />MarkingsHigh Visibility <br />Crosswalk Lane divider and/or <br />c-curb divider <br />Road StripingHigh Visibility School <br />Crosswalk <br />Bike Sharrow <br />Marking <br />DISCLAIMER NOTE: All <br />improvements shown in <br />concept plans are subject <br />to further evaluation. <br />Note: All driveways with bike lanes or separated bike lanes to receive driveway treatments in <br />the form of 'continuous sidewalks' or rubber humps. See details page for more information.Figure 6-16: Edinger Avenue and Maple Street Recommendations <br />Note: All driveways with bike lanes or separated <br />bikeways to receive driveway treatments in the form <br />of ‘continuous sidewalks’ or rubber humps. See <br />details page for more information.  <br />  <br />City Council 32 – 134 6/4/2024