Laserfiche WebLink
128 <br />15. Edinger Avenue and Maple Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Edinger Avenue and Maple Street is a unique offset intersection, <br />near the middle of the southeast quarter of the City, with Maple <br />Street northbound centerline shifted west 150 feet relative to the <br />southbound side of Maple Street. Another unique feature of the <br />intersection is a dedicated multi-use path that runs adjacent to the <br />southbound leg of Maple Street then runs north along a power line <br />easement between single family residential backyards. Land uses are <br />limited to single family residential. There are a total of five westbound <br />and eastbound vehicle lanes. North and southbound lanes on Maple <br />are small residential streets with limited local traffic. High traffic <br />volumes occur on the westbound and eastbound legs. Collision <br />rates are not high, but during the study period one severe injury has <br />occurred at the pedestrian crossing. A raised center median with <br />multi-use path and traffic signal is provided for people walking and <br />bicycling across Edinger Ave. Sidewalks, curb ramps, and bus stops <br />are provided on both sides of the street. No bicycle facilities are <br />provided on the westbound and eastbound legs on Edinger. Figure <br />6-16 shows recommended improvements that could be extended <br />farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />0 0.5 10.25 Miles <br />Serious Injuries and Fatalities between 2017-2021 <br />0 <br />Pedestrian <br />0 1 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))**** <br />11,,001111,,663300$$ 11,,223300,,880033$$ <br />5500,,000000$$ 6600,,883333$$ <br />11,,006622,,000000$$ 11,,229922,,000000$$ <br />114400,,000000$$ 118800,,000000$$ <br />119900,,000000$$ 224400,,000000$$ <br />3300,,000000$$ 4400,,000000$$ CM221100,,000000$$ 226600,,000000$$ <br />557700,,000000$$ 772200,,000000$$ <br />11,,664400,,000000$$ 22,,002200,,000000$$ <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SS aannttaa AAnnaa VViissiioonn ZZeerroo <br />EEddiinngg eerr AAvv ee//MMaappllee SStt <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT <br />Santa Ana Vision Zero Summary <br />  <br />  <br />City Council 32 – 133 6/4/2024