Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />RECOMMENDED ENGINEERING IMPROVEMENTS <br />135 <br />Add yellow reflective border on <br />signal heads on all four approaches <br />Segerstrom Ave Flower StDyer Rd <br />Add high visibility continental <br />crosswalks with stop bar 5 ft <br />behind crosswalk <br />Add hardened <br />centerline in <br />front of median <br />Add curb refuge islands with truck <br />aprons at corners or curb extensions <br />with directional wheelchair ramps <br />Add <br />crossbikes <br />Add raised Type C curb on <br />yellow divider line <br />Include bicycle/pedestrian <br />friendly signal timing, such <br />as LPIs, if possible. <br />Existing two-way multi-use path <br />Add separated <br />bikeway <br />Add separated <br />bikeway <br />KTU+A <br />3916 Normal St <br />San Diego, CA 92103 Santa Ana Vision Zero Plan <br />Conceptual Site Plan Scale: 1" = 40'-0" <br />January 2024 <br />Flower St and Dyer Rd/Segerstrom Ave <br />Multi-use Path <br />Bike Lane MarkingBike Crossing <br />MarkingsHigh Visibility <br />Crosswalk Lane divider and/or <br />c-curb divider <br />Road StripingHigh Visibility School <br />Crosswalk Bike Sharrow Marking <br />DISCLAIMER NOTE: All <br />improvements shown in <br />concept plans are subject <br />to further evaluation. <br />Note: All driveways with bike lanes or separated bike lanes to receive driveway treatments in <br />the form of 'continuous sidewalks' or rubber humps. See details page for more information.Figure 6-19: Dyer Road and Flower Street Recommendations <br />Note: All driveways with bike lanes or separated <br />bikeways to receive driveway treatments in the form <br />of ‘continuous sidewalks’ or rubber humps. See <br />details page for more information.  <br />  <br />City Council 32 – 140 6/4/2024