Laserfiche WebLink
136 <br />19. Flower Street and Alton Avenue <br />Intersection Project <br />Existing Conditions and Recommendations <br />Flower Street and Alton Avenue is a moderately busy intersection at <br />the southeast quarter of the City with single family residential at both <br />west side corners. MacArthur Fundamental Intermediate School is <br />on the southeast corner and a church is on the northeast corner. Not <br />counting turn lanes, there are four north-south vehicle lanes, but only <br />two west-east through lanes. Moderate traffic volumes has resulted <br />in relatively low collision rates with no fatalities or severe injuries <br />during the study period. Sidewalks, curb ramps, and bus stops are <br />provided on both sides of the street. No bicycle facilities are provided <br />on the vehicle travel lane. However, there is a multi-use path running <br />north-south along Flower Street and the channelized storm drain that <br />starts north of the intersection. Figure 6-20 shows recommended <br />improvements that could be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />0 0.5 10.25 Miles <br />Serious Injuries and Fatalities between 2017-2021 <br />0 <br />Pedestrian <br />0 0 <br />Bicycle Vehicle <br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))**** <br />11,,229955,,991100$$ 11,,557766,,667733$$ <br />4400,,000000$$ 4488,,666666$$ <br />11,,333366,,000000$$ 11,,662266,,000000$$ <br />117700,,000000$$ 221100,,000000$$ <br />224400,,000000$$ 330000,,000000$$ <br />3300,,000000$$ 4400,,000000$$ CM226600,,000000$$ 332200,,000000$$ <br />770000,,000000$$ 887700,,000000$$ <br />22,,004400,,000000$$ 22,,550000,,000000$$ <br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT <br />SS aannttaa AAnnaa VViissiioonn ZZeerroo <br />FF lloo wweerr SStt//AAllttoonn AAvvee <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE <br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT <br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT <br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS <br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />PPSS&&EE ((1177..55%%)) <br />RRIIGGHHTT OOFF WWAAYY ((22%%)) <br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%)) <br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT <br />Santa Ana Vision Zero Summary <br />  <br />  <br />City Council 32 – 141 6/4/2024