<br />19. Flower Street and Alton Avenue
<br />Intersection Project
<br />Existing Conditions and Recommendations
<br />Flower Street and Alton Avenue is a moderately busy intersection at
<br />the southeast quarter of the City with single family residential at both
<br />west side corners. MacArthur Fundamental Intermediate School is
<br />on the southeast corner and a church is on the northeast corner. Not
<br />counting turn lanes, there are four north-south vehicle lanes, but only
<br />two west-east through lanes. Moderate traffic volumes has resulted
<br />in relatively low collision rates with no fatalities or severe injuries
<br />during the study period. Sidewalks, curb ramps, and bus stops are
<br />provided on both sides of the street. No bicycle facilities are provided
<br />on the vehicle travel lane. However, there is a multi-use path running
<br />north-south along Flower Street and the channelized storm drain that
<br />starts north of the intersection. Figure 6-20 shows recommended
<br />improvements that could be extended farther along the route.
<br />See Appendix D for a detailed breakdown of all cost estimates.
<br />Project Location
<br />0 0.5 10.25 Miles
<br />Serious Injuries and Fatalities between 2017-2021
<br />0
<br />Pedestrian
<br />0 0
<br />Bicycle Vehicle
<br />CCuurrrreenntt YYeeaarr CCoosstt EEssccaallaatteedd CCoosstt ((22002288))****
<br />11,,229955,,991100$$ 11,,557766,,667733$$
<br />4400,,000000$$ 4488,,666666$$
<br />11,,333366,,000000$$ 11,,662266,,000000$$
<br />117700,,000000$$ 221100,,000000$$
<br />224400,,000000$$ 330000,,000000$$
<br />3300,,000000$$ 4400,,000000$$ CM226600,,000000$$ 332200,,000000$$
<br />770000,,000000$$ 887700,,000000$$
<br />22,,004400,,000000$$ 22,,550000,,000000$$
<br />TTOOTTAALL DDEELLIIVVEERRYY CCOOSSTT
<br />SS aannttaa AAnnaa VViissiioonn ZZeerroo
<br />FF lloo wweerr SStt//AAllttoonn AAvvee
<br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt))
<br />SSUUMMMMAARRYY OOFF PPRROOJJEECCTT CCOOSSTT EESSTTIIMMAATTEE
<br />TTOOTTAALL CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT
<br />TTOOTTAALL RRIIGGHHTT OOFF WWAAYY CCOOSSTT
<br />TTOOTTAALL CCAAPPIITTAALL OOUUTTLLAAYY CCOOSSTTSS
<br />PPAA//EEDD ((1122..55%%))DESIGN* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were
<br />made.
<br />PPSS&&EE ((1177..55%%))
<br />RRIIGGHHTT OOFF WWAAYY ((22%%))
<br />CCOONNSSTTRRUUCCTTIIOONN ((1199%%))
<br />TTOOTTAALL PPRROOJJEECCTT CCOOSSTT