|
Appendix D
<br />CCuu rrrreenntt YYee aarr CCoo sstt EE sscc aall aattee dd CCoosstt ((22 002288 ))**
<br />55,,440000,,000000$$ 66,,5577 00,,000000$$
<br />339900,,000000$$ 44 88 00,,000000$$
<br />55,,779900 ,,0000 00$$ 77 ,,005500 ,,0000 00$$
<br />773300,,000000$$ 88 9900,,000000$$
<br />11,,002200,,000000$$ 11,,225500,,000000$$
<br />11 2200,,000000$$ 115500,,000000$$ CM11 ,,1111 00,,000000$$ 11,,336600,,000000$$
<br />22,,998800 ,,0000 00$$ 33,,665500 ,,0000 00$$
<br />88 ,,8800 00,,00 0000$$ 11 00,,7700 00,,00 0000$$
<br />SS aa nn tt aa AA nn aa VV ii ss ii oo nn ZZ ee rr oo
<br />11 ss tt SS tt ((FF aa ii rr vv ii ee ww SS tt tt oo BB rr ii ss tt oo ll SS tt ))
<br />((CCoo rrrriiddoorr SS aaff eettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: MMeeddiiaann IIssllaannddss,,
<br />CCuurrbb EExxtteennssiioonnss,, DDiirreeccttiioo nnaall CCuurrbb RRaammppss,, BBiikkee LLaanneess,, aanndd BBiikk ee CCrroo ssssiinnggss))
<br />SSUUMMMMAA RR YY OOFF PP RR OOJJ EECC TT CC OOSSTT EE SSTTIIMMAA TT EE
<br />TTOOTTAA LL CCOONNSSTTRRUU CC TTIIOONN CC OOSSTT
<br />TTOOTTAA LL RRII GG HHTT OOFF WW AAYY CC OOSSTT
<br />TTOO TT AALL CCAA PPIITTAA LL OO UUTTLLAA YY CCOO SSTTSS
<br />TT OO TT AALL PPRROOJJ EE CCTT CC OO SS TT
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made.
<br />PPSS&&EE ((1177 ..55%%))
<br />RRII GG HHTT OOFF WW AAYY ((22%%))
<br />CCOONNSSTTRRUU CC TTIIOONN ((11 99%%))
<br />TT OOTTAA LL DDEE LL II VVEE RR YY CCOO SSTTDESIGNPPAA//EEDD ((11 22..55%%))
<br />Santa Ana Vision Zero - Top 5 Summary
<br />
<br />
<br />City Council 32 – 195 6/4/2024
|