Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />Appendix D <br />1 Install Concrete - Curb Ramp EA 63 8,000$ $504,000 <br />2 Install Concrete - Median Curb CY 227 1,230$ $279,210 <br />3 Install Concrete - Curb and Gutter CY 142 1,040$ $147,680 <br />4 Install Concrete - Sidewalk CY 277 850$ $235,450 <br />5 Install Concrete - Textured Pavment CY 129 890$ $114,810 <br />6 Roadway Excavation CY 4355 110$ $479,050 <br />7 Remove Concrete CY 846 340$ $287,640 <br />8 Hot Mix Asphalt TON 608 140$ $85,120 <br />9 Base Repair (HMA)****TON 2059 140$ $288,260 <br />10 Slurry TON 507 600$ $304,200 <br />11 CL2 Aggregate Base CY 1958 130$ $254,540 <br />12 Signing and Striping LS 1 110,700$ $110,700 <br />13 Centerline Hardening EA 8 5,000$ $40,000 <br />14 Landscape SF 17616 8$ $140,928 <br />15 Minor Drainage EA 8 $20,000 $160,000 <br />$$33,,443311,,558888 <br />16 Minor Items (10% of Items 1-15) *LS 1 $344,000 $344,000 <br />$$33,,777755,,558888 <br />17 Mobilization (10% of Items 1-16)LS 1 $378,000 $378,000 <br />$$44,,115533,,558888 <br />$1,246,100 <br />$5,399,688 <br />$$55,,339999,,668888 <br />$$339900,,000000 <br />$$55,,778899,,668888 <br />* <br />**This feasibility level estimate includes a 30% contingency intended to compensate for the use of preliminary and limited information. <br />*** <br />****Assumes 8% of project area reicieving Slurry Seal treatment will require Base Repair. <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt******== <br />GGRRAANNDD TTOOTTAALL== <br />Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. <br /> Utility improvements such as water, communication, gas, etc. are not included in these estimates. <br />SSaannttaa AAnnaa VV iiss iioonn ZZee rroo <br />11ss tt SStt ((FFaaii rrvvii eeww SStt tt oo BBrrii sstt ooll SStt)) <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />RROOAADDWWAAYY <br />DDRRAAIINNAAGGEE <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />CONTINGENCY (30%) ** <br />CONSTRUCTION SUBTOTAL <br />GGRRAANNDD TTOOTTAALL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 196 6/4/2024