|
Appendix D
<br />CCuu rrrreenntt YYeeaarr CCoosstt EE sscc aall aatteedd CCoosstt ((22002288 ))**
<br />88,,223300,,000000$$ 1100,,0011 00,,000000$$
<br />4411 00,,000000$$ 44 9988 ,,88 2288$$
<br />88 ,,66 4400 ,,0000 00$$ 11 00,,5500 99 ,,0000 00$$
<br />11,,0088 00,,000000$$ 11,,332200,,000000$$
<br />11,,552200,,000000$$ 11,,885500,,000000$$
<br />11 88 00,,000000$$ 222200,,000000$$ CM11,,665500,,000000$$ 22,,0011 00,,000000$$
<br />44,,44 3300 ,,0000 00$$ 55,,44 0000 ,,0000 00$$
<br />11 33 ,,1100 00,,00 0000$$ 1155 ,,9955 00,,00 0000$$
<br />SS aa nn tt aa AA nn aa VV ii ss ii oo nn ZZ ee rr oo
<br />EE uu cc ll ii dd SS tt ((HH aa zz aa rr dd AA vvee tt oo MMcc FF aa dd dd ee nn AA vvee ))
<br />((CCoorrrriiddoo rr SSaaffeettyy EEnnhhaanncceemmeennttss iinnccll uuddiinngg:: MMeeddiiaann IIssll aannddss,, BBiikkee LLaanneess,, BBiikkee CCrroossssiinnggss,,
<br />CCuurrbb EExxtteennssiioo nnss,, DD iirreeccttiioonnaall CCuurrbb RRaammppss aanndd PPrroo tteecctteedd CCoo rrnneerrss))
<br />SSUUMMMMAA RR YY OOFF PP RR OOJJ EECC TT CC OOSSTT EE SSTTIIMMAA TT EE
<br />TTOOTTAA LL CCOONNSSTTRRUU CC TTIIOONN CC OOSSTT
<br />TTOOTTAA LL RRII GG HHTT OOFF WW AAYY CC OOSSTT
<br />TTOO TT AALL CCAA PPIITTAA LL OO UUTTLLAA YY CCOO SSTTSS
<br />TT OO TT AALL PPRROOJJ EE CCTT CC OO SS TT
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made.
<br />PPSS&&EE ((1177 ..55%%))
<br />RRII GG HHTT OOFF WW AAYY ((22%%))
<br />CCOONNSSTTRRUU CC TTIIOONN ((11 99%%))
<br />TT OOTTAA LL DDEE LL II VVEE RR YY CCOO SSTTDESIGNPPAA//EEDD ((11 22..55%%))
<br />Santa Ana Vision Zero - Top 5 Summary
<br />
<br />
<br />City Council 32 – 197 6/4/2024
|