|
Appendix D
<br />CCuu rrrreenntt YYeeaarr CCoosstt EE sscc aall aatteedd CCoosstt ((22002288 ))**
<br />44 ,,88 9900,,000000$$ 55,,995500,,000000$$
<br />3377 00,,000000$$ 44 6600,,000000$$
<br />55 ,,226600 ,,0000 00$$ 66,,44 1100 ,,0000 00$$
<br />666600,,000000$$ 8811 00,,000000$$
<br />993300,,000000$$ 11,,11 44 00,,000000$$
<br />1111 00,,000000$$ 11 44 00,,000000$$ CM11 ,,000000,,000000$$ 11 ,,222200,,000000$$
<br />22 ,,77 0000 ,,0000 00$$ 33,,331100 ,,0000 00$$
<br />88 ,,0000 00,,00 0000$$ 99,,7755 00,,00 0000$$ TT OO TT AALL PPRROOJJ EE CCTT CC OO SS TT
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made.
<br />PPSS&&EE ((1177 ..55%%))
<br />RRII GG HHTT OOFF WW AAYY ((22%%))
<br />CCOONNSSTTRRUU CC TTIIOONN ((11 99%%))
<br />TT OOTTAA LL DDEE LL II VVEE RR YY CCOO SSTTDESIGNPPAA//EEDD ((11 22..55%%))
<br />SS aa nn tt aa AA nn aa VV ii ss ii oo nn ZZ ee rr oo
<br />MM aa ii nn SS tt ((11 ss tt SS tt tt oo 11 77 tt hh SS tt ))
<br />((CCoorrrriiddoo rr SSaaffeettyy EEnnhhaanncceemmeennttss iinnccll uuddiinngg:: MMeeddiiaann IIssll aannddss,,
<br />CCuurrbb EExxtteennssiioonnss,, aanndd DD iirreeccttiioonnaall CCuurrbb RRaammppss))
<br />SSUUMMMMAA RR YY OOFF PP RR OOJJ EECC TT CC OOSSTT EE SSTTIIMMAA TT EE
<br />TTOOTTAA LL CCOONNSSTTRRUU CC TTIIOONN CC OOSSTT
<br />TTOOTTAA LL RRII GG HHTT OOFF WW AAYY CC OOSSTT
<br />TTOO TT AALL CCAA PPIITTAA LL OO UUTTLLAA YY CCOO SSTTSS
<br />Santa Ana Vision Zero - Top 5 Summary
<br />
<br />
<br />City Council 32 – 201 6/4/2024
|