Laserfiche WebLink
SANTA ANA VISION ZERO PLAN <br />Appendix D <br />1 Install Concrete - Curb Ramp EA 72 8,000.00$ $576,000 <br />2 Install Concrete - Median Curb CY 119 1,230.00$ $146,370 <br />3 Install Concrete - Curb and Gutter CY 98 1,040.00$ $101,920 <br />4 Install Concrete - Sidewalk CY 152 850.00$ $129,200 <br />5 Install Concrete - Textured Pavment CY 102 890.00$ $90,780 <br />6 Cold Plane SQYD 35145 6$ $210,867 <br />7 Roadway Excavation CY 1771 110.00$ $194,810 <br />8 Remove Concrete CY 449 340.00$ $152,660 <br />9 Hot Mix Asphalt TON 8256 140.00$ $1,155,840 <br />10 CL2 Aggregate Base CY 1048 130.00$ $136,240 <br />11 Signing and Striping LS 1 79,700.00$ $79,700 <br />12 Landscape SF 8948 8.00$ $71,584 <br />13 Minor Drainage EA 3 $20,000 $60,000 <br />$$33,,110055,,997711 <br />14 Minor Items (10% of Items 1-13) *LS 1 $311,000 $311,000 <br />$$33,,441166,,997711 <br />15 Mobilization (10% of Items 1-14)LS 1 $342,000 $342,000 <br />$$33,,775588,,997711 <br />$1,127,700 <br />$4,886,671 <br />$$44,,888866,,667711 <br />$$337700,,000000 <br />$$55,,225566,,667711 <br />* <br />**This feasibility level estimate includes a 30% contingency intended to compensate for the use of preliminary and limited information. <br />*** <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. <br /> Utility improvements such as water, communication, gas, etc. are not included in these estimates. <br />RROOAADDWWAAYY <br />DDRRAAIINNAAGGEE <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />CONTINGENCY (30%) ** <br />CONSTRUCTION SUBTOTAL <br />GGRRAANNDD TTOOTTAALL <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt******== <br />GGRRAANNDD TTOOTTAALL== <br />Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />SSaanntt aa AA nnaa VVii ssii oonn ZZ eerroo <br />MMaaiinn SStt ((11ss tt SStt ttoo 1177tthh SStt )) <br />((FFeeaassiibbiilliittyy OOppiinniioonn ooff PPrroobbaabbllee CCoosstt)) <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />Santa Ana Vision Zero - Top 5 Estimate <br />  <br />  <br />City Council 32 – 202 6/4/2024