Appendix E <br />1 Install Concrete - Curb Ramp EA 21 8,000$ $168,000 <br />2 Install Concrete - Median Curb CY 103 1,500$ $154,500 <br />3 Install Concrete - Truck Apron Curb CY 25 1,500$ $37,500 <br />4 Install Concrete - Curb and Gutter CY 189 1,080$ $204,120 <br />5 Install Concrete - Sidewalk CY 66 1,040$ $68,640 <br />6 Install Concrete - Driveway CY 70 1,040$ $72,774 <br />7 Install Concrete - Textured Pavment CY 128 1,130$ $144,640 <br />8 Install Concrete - Truck Apron CY 23 1,860$ $42,780 <br />9 Roadway Excavation CY 1959 260$ $509,340 <br />10 Remove Concrete CY 423 400$ $169,200 <br />11 Hot Mix Asphalt TON 511 345$ $176,295 <br />12 Slurry TON 167 790$ $131,930 <br />13 Base Repair (HMA) ****TON 677 345$ $233,565 <br />14 Raised Bike Path (HMA)TON 357 345$ $123,165 <br />15 CL2 Aggregate Base CY 802 180$ $144,360 <br />16 Signing and Striping LS 1 44,500$ $44,500 <br />17 Rubber Hump EA 41 200$ $8,200 <br />18 Centerline Hardening EA 8 5,000$ $40,000 <br />19 Bus Stop Improvements EA 1 30,000$ $30,000 <br />20 Drainage Improvements LS 1 $201,000 $201,000 <br />21 Signal Modification EA 1 $250,000 $250,000 <br />$$22,,995544,,550099 <br />22 Minor Items (15% of Items 1-21) **LS 1 $444,000 $444,000 <br />$$33,,339988,,550099 <br />23 Mobilization (10% of Items 1-22)LS 1 $340,000 $340,000 <br />$$33,,773388,,550099 <br />$1,308,500 <br />$5,047,009 <br />$$55,,004477,,000099 <br />$$223300,,000000 <br />$$55,,227777,,000099 <br />* <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, gas, etc. are not included in these estimates. <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />EELLEECCTTRRIICCAALL <br />RROOAADDWWAAYY <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />An additional $130K of roadway easment is estimated for the Continuous Sidewalk. <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt**== <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />GGRRAANNDD TTOOTTAALL <br />CONSTRUCTION SUBTOTAL <br />CONTINGENCY (35%) *** <br />SSUUBBTTOOTTAALL <br />DDRRAAIINNAAGGEE <br />SS aann ttaa AAnnaa VViissiioo nn ZZ eerr oo <br />BBrr iissttoo ll SS tt ffrroo mm SSeeggeerrssttoo rrmm AAvvee tt oo AAll ttoo nn AA vvee <br />((CCoorrrriiddoorr SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: PPrrootteecctteedd CCoorrnneerrss,, DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCeenntteerrlliinnee HHaarrddeenniinngg,, CCllaassss IIVV BBiikkee LLaanneess,, CCoonnttiinnuuoouuss <br />SSiiddeewwaallkkss,, BBiikkee CCrroossssiinnggss,, aanndd CCoonnfflliicctt SSttrriippiinngg)) <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 211 6/4/2024